Author: Vasichev, S.S.
Paper Title Page
TUPSA001 Commissioning of e+/e Transfer Line from BINP Injection Complex to VEPP-2000 Facility 213
 
  • I.M. Zemlyansky, Yu. Aktershev, V.V. Anashin, A.V. Andrianov, A.M. Batrakov, O.V. Belikov, D.E. Berkaev, M.F. Blinov, B.A. Dovzhenko, F.A. Emanov, V.V. Gambaryan, V.A. Kiselev, I. Koop, A.A. Krasnov, I.A. Mikheev, D.A. Nikiforov, A.V. Otboev, A.V. Pavlenko, V.P. Prosvetov, V.V. Rashchenko, Yu. A. Rogovsky, A.V. Semenov, P.Yu. Shatunov, Y.M. Shatunov, D.B. Shwartz, A.A. Starostenko, S.S. Vasichev, V.D. Yudin, Yu.M. Zharinov
    BINP SB RAS, Novosibirsk, Russia
  • A.A. Krasnov, A.V. Pavlenko, Yu. A. Rogovsky, D.B. Shwartz, A.A. Starostenko
    NSU, Novosibirsk, Russia
 
  Funding: The work is supported by the Ministry of Education and Science of the Russian Federation and by grant NSh-10088.2016.2.
Commissioning of e+/e transfer line from Injection Complex to VEPP-2000 facility is done in 2016. Both electrons and positrons beams are injected to VEPP-2000 collider. The channel layout, lattice functions, magnetic elements, beam diagnostic system, vacuum system and control system are presented in this article. The details of commissioning process are also mentioned.
 
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)