Paper | Title | Page |
---|---|---|
WECDMH02 |
Testing of Electronic Components at FLNR JINR Accelerator Complex: Current Status and the 7-Year Roadmap | |
|
||
To meet the growing requirements of the Russian Space Agency (Roscosmos) in the electronic components testing, the first dedicated beamline was created in 2011. At 2014 the full value facility, consisted of three different beamlines, was successfully commissioned and routinely used. Since then, plenty of efforts were spent for upgrade of beamlines and elaboration of new methods of high energy heavy ion beam parameters evaluation and control under the SEE testing. The current status of the facility, the last news of the ion beam control at high level of LTE and the 7-year roadmap will be presented. | ||
![]() |
Slides WECDMH02 [17.676 MB] | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THPSC064 | Monitoring of Low Intensity Ion Beams at FLNR Accelerator Complex | 683 |
|
||
FLNR JINR host experimental researches in wide area of applied science, including medical, biological and radiation hardness investigations, where the beam diagnostics plays the key role. We provide beam monitoring at all stages of the experiment: inside the cyclotron, beam transport and ion beam profile visualization close to the physical target. The detailed overview of beam control and diagnostic solutions used in FLNR JINR for the low intensity and highly charged ion beams parameters evaluation will be presented. | ||
![]() |
Poster THPSC064 [4.715 MB] | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |