Paper | Title | Page |
---|---|---|
TUPSA002 |
First Results of Startup of The Second Accelerating Section of The LUE-200 Linac | |
|
||
It announces the startup of the second accelerating section of the LUE-200 electron linac of the pulsed resonance neutrons source (IREN)of the Laboratory of Neutron Physics. The block diagram, klystron and modulator parameters are presented. As a result of optimization of the accelerating system and focusing system the electron beam implemented to target. The basic parameters of the beam are measured: beam current, energy, and the energy spectrum of the beam. | ||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPSA019 | Upgrade of the RF System on the LUE-200 | 256 |
|
||
In the report works on upgrade of RF system of the LUE-200 (IREN) electron linac are provided. The main attention is paid to system of preliminary excitement of klystrons. After work on installation of the second accelerating section RF system of Installation it was considerably remade that allowed to carry out start-up of the second stage of the IREN installation successfully. Methods, features and problems in case of a training of two accelerating sections are discussed. Influence of the temperature and frequency modes on joint operation of accelerating sections. Results of setup of the RF system and a training of sections, and also results of posting of a bunch are given. | ||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |