Paper | Title | Page |
---|---|---|
TUPSA002 |
First Results of Startup of The Second Accelerating Section of The LUE-200 Linac | |
|
||
It announces the startup of the second accelerating section of the LUE-200 electron linac of the pulsed resonance neutrons source (IREN)of the Laboratory of Neutron Physics. The block diagram, klystron and modulator parameters are presented. As a result of optimization of the accelerating system and focusing system the electron beam implemented to target. The basic parameters of the beam are measured: beam current, energy, and the energy spectrum of the beam. | ||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THPSC082 |
Control System of LUE-200 of IREN Facility - Status | |
|
||
The control system of LUE-200 an intensive pulse source of resonant neutrons (IREN) is described. The architecture of a control system and equipment structure is shown. Control system construction bases on the maximum use of instrumentation and the software for industrial systems. The control system solves following problems: set and t control of parameters of the basic systems of the accelerator (modulators, the RF-systems, focusing elements, the synchronizer, vacuum system etc.) with display of these parameters; beam diagnostics (a beam current, a profile and a beam position, energy etc.); protection of elements of the accelerator at an exit of their parameters from a working range; creation of a database of operating regimes of the accelerator; monitoring radiation level and the organization of lockup. | ||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |