Author: Osipov, N.F.
Paper Title Page
WECDMH02
Testing of Electronic Components at FLNR JINR Accelerator Complex: Current Status and the 7-Year Roadmap  
 
  • S. Mitrofanov, B. Gikal, G.G. Gulbekyan, I.V. Kalagin, N.F. Osipov, S.V. Paschenko, V.A. Skuratov, Yu.G. Teterev
    JINR, Dubna, Moscow Region, Russia
  • V.S. Anashin
    United Rocket and Space Corporation, Institute of Space Device Engineering, Moscow, Russia
 
  To meet the growing requirements of the Russian Space Agency (Roscosmos) in the electronic components testing, the first dedicated beamline was created in 2011. At 2014 the full value facility, consisted of three different beamlines, was successfully commissioned and routinely used. Since then, plenty of efforts were spent for upgrade of beamlines and elaboration of new methods of high energy heavy ion beam parameters evaluation and control under the SEE testing. The current status of the facility, the last news of the ion beam control at high level of LTE and the 7-year roadmap will be presented.  
slides icon Slides WECDMH02 [17.676 MB]  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)