Paper | Title | Page |
---|---|---|
WEXMH01 | Feeding BINP Colliders with the New VEPP-5 Injection Complex | 56 |
|
||
VEPP-4 and VEPP-2000 e+e− colliders are switching to feed from VEPP-5 Injection Complex via newly constructed K-500 beam transfer line. Since first operation of K-500 at the end of 2015 injection complex delivered e+ and e- beams to VEPP-2000 facility and is getting ready to work with VEPP-4. Upgraded injection chain demonstrated ability to provide design luminosity toVEPP-2000 and techniques of reliable operation are now under development. The designand operation experience of Injection Complex and transfer lines will be presented. | ||
![]() |
Slides WEXMH01 [6.228 MB] | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THPSC085 | Present Status of VEPP-5 Injection Complex Control System | 730 |
|
||
VEPP-5 injection complex is being put into operation as beam source of VEPP-2000 and VEPP-4 colliders at the end of 2016. Its control system is being upgraded in order to reliably work with beam users and increase its manageability computer infrastructure was reconsidered to provide high availability and flexibility through virtualization of control servers. The paper presents architecture and implementation of complex computer infrastructure. A control software set based on CXv4, EPICS and VCAS frameworks under operating system Linux deals with a set of CAN, CAMAC and Ethernet specialized hardware. The software and hardware architecture and implementation is described. | ||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |