WEXMH01 Feeding BINP Colliders with the New VEPP-5 Injection Complex 56
 
  • F.A. Emanov, A.V. Andrianov, K.V. Astrelina, V.V. Balakin, A.M. Barnyakov, O.V. Belikov, D.E. Berkaev, M.F. Blinov, Y.M. Boimelshtain, D. Bolkhovityanov, A.G. Chupyra, N.S. Dikansky, A.R. Frolov, Ye.A. Gusev, G.V. Karpov, A.S. Kasaev, V.I. Kokoulin, A.A. Kondakov, I. Koop, I.V. Kuptsov, G.Y. Kurkin, R.M. Lapik, N.N. Lebedev, A.E. Levichev, P.V. Logatchov, Yu. Maltseva, P.V. Martyshkin, A.A. Murasev, D.A. Nikiforov, A.V. Pavlenko, V.M. Pavlov, A.V. Petrenko, V. Podlevskih, V.V. Rashchenko, S.L. Samoylov, S.V. Shiyankov, A.N. Skrinsky, A.A. Starostenko, D.P. Sukhanov, A.G. Tribendis, A.S. Tsyganov, S.V. Vasiliev, V.D. Yudin, I.M. Zemlyansky
    BINP SB RAS, Novosibirsk, Russia
  • Yu. A. Rogovsky
    Budker INP & NSU, Novosibirsk, Russia
  • A.L. Romanov
    Fermilab, Batavia, Illinois, USA
 
  VEPP-4 and VEPP-2000 e+e colliders are switching to feed from VEPP-5 Injection Complex via newly constructed K-500 beam transfer line. Since first operation of K-500 at the end of 2015 injection complex delivered e+ and e- beams to VEPP-2000 facility and is getting ready to work with VEPP-4. Upgraded injection chain demonstrated ability to provide design luminosity toVEPP-2000 and techniques of reliable operation are now under development. The designand operation experience of Injection Complex and transfer lines will be presented.  
slides icon Slides WEXMH01 [6.228 MB]  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPSC074 Longitudinal Beam Distribution Measurements in Damping Ring of VEPP-5 Injection Complex 705
 
  • V.V. Balakin, O. Anchugov, D.E. Berkaev, F.A. Emanov, G.Y. Kurkin, O.I. Meshkov
    BINP SB RAS, Novosibirsk, Russia
  • V.L. Dorokhov
    BINP, Novosibirsk, Russia
 
  Injection Complex VEPP-5 was turned into operation in the end of 2015 in the Budker Institute of Nuclear Physics (Novosibirsk, Russia). The main task of the facility is production, acceleration and transportation of high intensity electron and positron beams for two BINP's colliders. Now, VEPP-5 successfully delivers electron and positron beams to the collider VEPP-2000 and ready to start operation with the acceleration complex VEPP-4M. Beam diagnostics issues are very important for VEPP-5 facility tuning during the operation. Longitudinal beam diagnostic based on synchrotron radiation in the VEPP-5 Damping Ring is presented in the article. Equipment operation principle, main measurement results and future prospects are presented in this paper.  