Paper | Title | Page |
---|---|---|
WEXMH01 | Feeding BINP Colliders with the New VEPP-5 Injection Complex | 56 |
|
||
VEPP-4 and VEPP-2000 e+e− colliders are switching to feed from VEPP-5 Injection Complex via newly constructed K-500 beam transfer line. Since first operation of K-500 at the end of 2015 injection complex delivered e+ and e- beams to VEPP-2000 facility and is getting ready to work with VEPP-4. Upgraded injection chain demonstrated ability to provide design luminosity toVEPP-2000 and techniques of reliable operation are now under development. The designand operation experience of Injection Complex and transfer lines will be presented. | ||
![]() |
Slides WEXMH01 [6.228 MB] | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPSA001 | Commissioning of e+/e− Transfer Line from BINP Injection Complex to VEPP-2000 Facility | 213 |
|
||
Funding: The work is supported by the Ministry of Education and Science of the Russian Federation and by grant NSh-10088.2016.2. Commissioning of e+/e− transfer line from Injection Complex to VEPP-2000 facility is done in 2016. Both electrons and positrons beams are injected to VEPP-2000 collider. The channel layout, lattice functions, magnetic elements, beam diagnostic system, vacuum system and control system are presented in this article. The details of commissioning process are also mentioned. |
||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |