Author: Aleksandrov, V.
Paper Title Page
THPSC013 The Nonsymmetrical Variant of the Nonferromagnetic Extraction Kicker Magnet of the NICA Booster 566
 
  • V. Aleksandrov, A.A. Fateev, A. Tuzikov
    JINR, Dubna, Moscow Region, Russia
 
  Development and creation of the NICA acceleration complex are continued at JINR (Dubna). One of the main facilities of the complex is the Booster in which preliminary acceleration and cooling of an ion beam is performed. Further acceleration is fulfilled in the circular accelerator NUCLOTRON. The beam transfer from the Booster into the NUCLOTRON is provided by means of the fast extraction system and one of its central elements is the kicker magnet. For the beam deflecting into the extraction septum-magnet it is supposed to use the nonferrous kicker magnet consisting of two couples of conductors. Recent changes made in configuration of the Booster extraction section demand decrease of the kicker magnet length that leads to change of the beam extraction scheme. This report is devoted to the choice of the alternative design of the magnet (the nonsymmetrical variant).  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)