TUPSA23 LEPTA - the Facility for Fundamental and Applied Research 83
 
  • E.V. Ahmanova, V.M. Drobin, P. Horodek, A.G. Kobets, I.N. Meshkov, O. Orlov, A.Yu. Rudakov, V.V. Seleznev, A.A. Sidorin, S. Yakovenko
    JINR, Dubna, Moscow Region, Russia
  • M.K. Eseev
    NAFU, Arkhangelsk, Russia
 
  Storage ring of LEPTA facility was commissioned in September 2004 and was under development up to now. The positron injector has been constructed in 2005-2010, and beam transfer channel – in 2011. By the end of August 2011 experiments on electron and positron injection into the ring have been started. The last results are presented in this report: studies of e+/e dynamics in trap, e+ beam in the ring, LEPTA upgrade (vacuum, e+ source with cryocooler), Channel for PAS.