Author: Acharya, S.
Paper Title Page
THPD03 PLC Controlled Search & Secure Safety Interlock System for Accelerator 142
 
  • V. Sharma, S. Acharya, S. Gond, K.C. Mittal, R.N. Rajan
    BARC, Mumbai, India
 
  PLC based search and scram system is designed and commissioned to ensure the accelerator cell being free from any human occupancy before we start the accelerator. Search and Scram units which are controlled by PLC have been installed at different places inside the cell area. The operator of the accelerator has to clear all the units by pressing the secure button. Clearing each of the unit and pressing the button ensures that there is nobody left inside the cell after all the units are cleared. If someone remains trapped inside cell even after search and secure operation successfully performed, he can press any emergency button located on each of the Scram unit to switch off the accelerator immediately. The operation is time limited so if the operator fails to do the search operation in time, the entire system will get tripped and will require to the operator to do the entire operation again. This system generates HV ON enable signal. If any of the door is opened or Scram is pressed the HV supply switches off and radiation ceases off immediately. This system has the merit that it offers timing and sequence flexibility but retains the safety merit of hard wired circuit.  
poster icon Poster THPD03 [0.571 MB]  
 
THPD04 Machine Throughput Improvement Achieved Using Innovative Control Technique 144
 
  • V. Sharma, S. Acharya, K.C. Mittal
    BARC, Mumbai, India
 
  Funding: BARC, Mumbai
A 10MeV, Electron beam, RF Linac is operational at EBC, Kharghar, Navi Mumbai. The beam output scans one meter length in a scan horn. The product under irradiation is placed in a conveyor trolley where trolley is one meter long and one meter gap between the trolleys. With the constant speed of 5mtrs/min operation of trolley, the dose utilization is 50% since the beam falls in the gap between the trolleys. We have modulated the speed as 5mtrs./min when trolley gap is under the beam and 0.1 mtrs./min when trolley is under the beam. This way the beam utilization for the irradiation goes up to 98% hence 48% rise in productivity. A 20kV 10KJ Electromagnetic machining (EMM) facility is developed by APPD/BARC. In this EMM facility a large value capacitor is charged by a DC supply to a constant voltage. This charged capacitor is then discharged using triggered spark gap into a coil to generate intense magnetic field. This magnetic field generates the eddy current into the job piece to do the forming. We have used a PLC based control system to control the machine.
 
poster icon Poster THPD04 [0.341 MB]