Title |
Page |
Commissioning and Operation of the LEP Pretzel Scheme |
2013 |
- R. Bailey, J.M. Jowett, W. Kalbreier, D. Wang (CERN)
|
|
Stripline Beam Position Monitor for the MIT-Bates South Hall Ring |
2331 |
- J.B. Flanz, R. Averill, E. Ihloff, K.D. Jacobs, D. Wang, A. Zolfaghari (MIT-Bates)
|
|
The LEP Impedance Model |
3429 |
- D. Brandt, K. Cornelis, A. Hofmann, C. Juillard, E. Peschardt, E. Rossa, F. Tecker, D. Wang, B. Zotter (CERN), V. Danilov, E. Perevedentsev (BINP), L. Rivkin (Paul Scherrer Institut)
|
|
Vacuum System Design of the MIT-Bates South Hall Ring |
3851 |
- E. Ihloff, R. Averill, J. Flanz, K. Jacobs, S. Sobczynski, D. Wang, A. Zolfaghari (MIT-Bates)
|
|