Title |
Page |
Consequences of Kicker Failure During HEB to Collider Injection and Possible Mitigation |
1360 |
- R. Soundranayagam, A.I. Drozhdin, N.V. Mokhov, B. Parker, R. Schailey, F. Wang (SSCL)
|
|
2 TeV HEB Beam Abort at the SSCL |
1369 |
- R. Schailey, J. Bull, T. Clayton, P. Kocur, N.V. Mokhov (SSCL)
|
|
Hydrodynamic Calculations of 20-TeV Beam Interactions with the SSC Beam Dump |
3090 |
- D.C. Wilson, R.P. Godwin, J.C. Goldstein, C.A. Wingate (LANL), N.V. Mokhov (SSCL)
|
|
Beam Loss Handling at the SSC |
3109 |
- I.S. Baishev, A.I. Drozhdin, N.V. Mokhov (SSCL)
|
|
Dealing with Abort Kicker Prefire in the Superconducting Super Collider |
3772 |
- A.I. Drozhdin, I.S. Baishev, N.V. Mokhov, B. Parker, R.D. Richardson, J. Zhou (SSCL)
|
|