Title |
Page |
Compensation of RF-Induced Energy Spread in the CEBAF Injector Chopping System |
426 |
- M. G. Tiefenback, G. A. Krafft (CEBAF)
|
|
Commissioning and Operation Experience with the CEBAF Recirculation Arc Beam Transport System |
587 |
- Y. Chao, M. Crofford, N. Dobeck, D. Douglas, A. Hofler, C. Hovater, G. A. Krafft, R. Legg, J. Perry, E. Price, S. Suhring, M. G. Tiefenback, J. van Zeijts (CEBAF)
|
|
Phasing Schemes for the CEBAF Cavities |
599 |
- S. N. Simrock, R. Kazimi, G. A. Krafft, L. Merminga, L. Ninan, S. Witherspoon (CEBAF)
|
|
Orbit Correction Implementation at CEBAF |
1895 |
- M. Bickley, B.A. Bowling, D. Douglas, A. Hofler, J. Kewisch, G. A. Krafft (CEBAF)
|
|
Performance of the CEBAF Arc Beam Position Monitors |
2298 |
- A.S. Hofler, B.A. Bowling, C.S. Higgins, P.K. Kloeppel, G. A. Krafft, K.L. Mahoney (CEBAF)
|
|
Energy Vernier System for CEBAF |
2364 |
- G. A. Krafft, J. J. Bisognano, M.T. Crofford, J.C. Hovater, L. Merminga, S. N. Simrock, S.D. Witherspoon (CEBAF), K. Kubo (KEK)
|
|
Studies of Multipass Beam Breakup and Energy Recovery Using the CEBAF Injector Linac |
3246 |
- N.S. Sereno, L.S. Cardman (University of Illinois), J. J. Bisognano, G. A. Krafft, C.K. Sinclair (CEBAF)
|
|
Operation of the CEBAF Linac with High Beam Loading |
3515 |
- L. Merminga, J. J. Bisognano, C. Hovater, G. A. Krafft, S. N. Simrock (CEBAF), K. Kubo (KEK)
|
|