A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Wenninger, J.

Paper Title Page
TUOAKI02 CERN Neutrinos to Gran Sasso (CNGS): Results from Commissioning 692
 
  • M. Meddahi, K. Cornelis, K. Elsener, E. Gschwendtner, W. Herr, V. Kain, M. Lamont, J. Wenninger
    CERN, Geneva
 
  The CNGS project (CERN Neutrinos to Gran Sasso) aims at directly detecting muon neutrinos-tau neutrinos oscillations. An intense muon- neutrinos beam is generated at CERN and directed towards LNGS (Laboratori Nazionali del Gran Sasso) in Italy where tau-neutrinos will be detected in large and complex detectors. An overview of the CNGS beam facility is given. Results from the primary and secondary beam line commissioning performed in summer 2006 are presented. Measurements are compared with expectations.  
slides icon Slides  
TUPAN096 High Intensity Commissioning of the SPS LSS4 Extraction for CNGS 1604
 
  • V. Kain, E. Carlier, E. H.R. Gaxiola, B. Goddard, M. Gourber-Pace, E. Gschwendtner, M. Meddahi, H. Vincke, H. Vincke, J. Wenninger
    CERN, Geneva
 
  The fast extraction in SPS LSS4 serves both the anti-clockwise ring of the LHC and the CERN Gran Sasso Neutrino facility (CNGS). The latter requires 2 fast extractions of 10.5 microsecond long batches per cycle, 50 milliseconds apart. Each batch will consist of 2.4·10+13 protons at 400 GeV, a factor of 10 in energy density above the equipment damage limit in case of beam loss. Active and passive protection systems are in place to guarantee safe operation and to respect the radiation limits close to the extraction region. In summer 2006 CNGS was commissioned including extraction with high intensity. A thorough setting-up of the extraction was performed as part of the CNGS commissioning, including aperture and beam loss measurements, and defining and checking of interlock thresholds for the extraction trajectory, magnet currents, kicker voltage and beam loss monitors. The various systems and the associated risks are discussed, the commissioning results are summarised and a comparison is made with predictions from simulations.  
TUZAC03 LHC Machine Protection 878
 
  • R. Schmidt, R. W. Assmann, E. Carlier, B. Dehning, R. Denz, B. Goddard, E. B. Holzer, V. Kain, B. Puccio, B. Todd, J. A. Uythoven, J. Wenninger, M. Zerlauth
    CERN, Geneva
 
  This paper addresses the imposing challenges of the LHC Machine Protection System.  
slides icon Slides  
TUPAN098 Beam Commissioning of the SPS LSS6 Extraction and TT60 for LHC 1610
 
  • B. Goddard, B. Balhan, E. H.R. Gaxiola, M. Gourber-Pace, L. K. Jensen, V. Kain, A. Koschik, T. Kramer, J. A. Uythoven, H. Vincke, J. Wenninger
    CERN, Geneva
 
  The new fast extraction system in LSS6 of the SPS and the first 100 m of transfer line TT60 was commissioned with low intensity beam in late 2006. The layout and functionality of the main elements are briefly explained, including the various hardware subsystems and the control system. The systems safety procedures, test objectives and measurements performed during the beam commissioning are described.  
TUPAN107 Beam Loss Response Measurements with an LHC Prototype Collimator in the SPS 1622
 
  • Th. Weiler, G. Arduini, R. W. Assmann, C. Bracco, H.-H. Braun, B. Dehning, P. Gander, E. B. Holzer, M. Jonker, R. Losito, A. Masi, L. Ponce, S. Redaelli, G. Robert-Demolaize, M. Sobczak, J. Wenninger
    CERN, Geneva
 
  Beam tests with an LHC prototype collimator were performed at the SPS in autumn 2006. Applying a new collimator control system many new beam measurements were performed. This contribution presents results on collimator-induced beam loss measurements and their applications to beam-based alignment of collimators and measurements of the beam size and position. Interesting features of the recorded beam loss signals are illustrated and possible impacts for LHC operation are discussed. The measured loss distributions around the full SPS ring are analyzed and compared with simulations.