Svandrlik, M.

Paper Title Page
MOPAN025 The Elettra Booster Magnets 206
 
  • D. Zangrando, D. Castronovo, M. Svandrlik, R. Visintini
    ELETTRA, Basovizza, Trieste
 
  The third generation light source ELETTRA has been in operation since 1993. A new 2.5 GeV full energy booster injector, that will replace the existing linear injector limited to a maximum energy of 1.2 GeV is now under construction and the commissioning will start this August. The paper reports on the construction of dipole, quadrupole, sextupole and steerer magnets and on the magnetic measurement results with a comparison with the requested specifications.  
TUPMN032 The New Elettra Booster Injector 983
 
  • M. Svandrlik, S. Bassanese, A. Carniel, K. Casarin, D. Castronovo, P. Craievich, G. D'Auria, R. De Monte, P. Delgiusto, S. Di Mitri, A. Fabris, R. Fabris, M. Ferianis, F. Giacuzzo, F. Iazzourene, G. L. Loda, M. Lonza, F. M. Mazzolini, D. M. Molaro, G. Pangon, C. Pasotti, G. Penco, L. Pivetta, L. Rumiz, C. Scafuri, G. Tromba, A. Vascotto, R. Visintini, D. Zangrando
    ELETTRA, Basovizza, Trieste
  • L. Picardi, C. Ronsivalle
    ENEA C. R. Frascati, Frascati (Roma)
 
  The new full energy injector for Elettra is under construction. The complex is made of a 100 MeV linac and a 2.5 GeV synchrotron, at 3 Hz repetition rate. With the new injector top-up operation shall be feasible. In the first semester of 2007 the machine assembly has been performed. In Summer 2007 the commissioning is scheduled, while in Fall 2007 the connection to the Storage Ring is planned. The status of the project will be reported in this paper.  
WEPMN017 RF System for the Elettra New Full Energy Booster Injector 2083
 
  • A. Fabris, M. Bocciai, L. Bortolossi, M. Ottobretti, C. Pasotti, M. Rinaldi, M. Svandrlik
    ELETTRA, Basovizza, Trieste
 
  The Elettra new full energy injector will be based on a 100 MeV linac and a 2.5 GeV booster synchrotron and it will replace the existing 1.2 linac injector. This paper presents the design, construction and the test results of the RF system for the booster synchrotron. The analysis of the foreseen operating scenario is also described. The system must be as simple and reliable as possible, taking into consideration the high availability required for the possible top-up mode of operation. It has also to be consistent with the other upgrades of the facility, as the upgrade of the storage ring RF system. The booster RF system will use a 500 MHz 5-cell copper cavity powered by a 60 kW klystron based power plant. The low level electronics has been in-house developed, starting from the system in operation in the storage ring, increasing the performances and developing the new features required by the use of a five-cell cavity, instead of a single cell one, and by the ramped operation. The commissioning of the new injector is scheduled to start in summer 2007, while the first Elettra operation for users with the new full energy injector is expected for the first quarter of 2008.