A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Perez, J. C.

Paper Title Page
MOPAN077 Geometry of the LHC Short Straight Sections Before Installation in the Tunnel: Resulting Aperture, Axis and BPM Positioning 335
 
  • D. P. Missiaen, P. Bestmann, M. C.L. Buzio, S. D. Fartoukh, M. Giovannozzi, J. B. Jeanneret, A. M. Lombardi, Y. Papaphilippou, S. Pauletta, J. C. Perez, H. Prin, E. Y. Wildner
    CERN, Geneva
 
  The Large Hadron Collider Short Straight Sections (SSS) are currently being installed in their final position in the accelerator tunnel. For all the SSSs, both those in the regular arcs as well as those in the insertion regions, magnetic and geometric measurements are made at different steps of their assembly. These stages range from production in the industry to the cryostating at CERN, as well as during and after cold tests or during installation of the BPM and the cold warm transition for the stand alone magnets. The results of the geometry at the various production stages by means of different procedures and analysis tools are reported and discussed in details in this paper.