A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Peake, D. J.

Paper Title Page
FRPMN002 Preliminary Studies for Top-up Operations at the Australian Synchrotron 3856
 
  • M. J. Boland, D. J. Peake
    ASP, Clayton, Victoria
  • R. P. Rassool
    Melbourne
 
  The Australian Synchrotron is now a fully commissioned synchrotron light source providing beam for users. With the facility now fully operational, the next major advancement in machine operations will be top-up mode. The advantages of running top-up are well documented by other third generation light sources; in broad terms it leads to a better quality beam for users and better experimental results. An overview will be given of the top-up runs that have been conducted and the instrumentation that was used. It has been demonstrated that top-up operation is possible, however improvements in injection efficiency and beam stability during injection are required before this can become a routine mode of operation.