A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Muller, R.

Paper Title Page
TUPMN015 First Commissioning Results of the Metrology Light Source 947
 
  • J. Feikes, M. Abo-Bakr, T. Birke, J. Borninkhof, P. Budz, K. B. Buerkmann-Gehrlein, R. Daum, O. Dressler, V. Duerr, F. Falkenstern, H. G. Glass, H. G. Hoberg, J. Kolbe, J. Kuszynski, R. Lange, I. Mueller, R. Muller, J. Rahn, G. Schindhelm, T. Schneegans, Th. Schroeter, D. Schueler, E. Weihreter, G. Wuestefeld
    BESSY GmbH, Berlin
  • G. Brandt, R. Fliegauf, A. Hoehl, R. Klein, R. Muller, R. Thornagel, G. Ulm
    PTB, Berlin
 
  Funding: Physikalisch-Technische Bundesanstalt, Abbestr. 2 - 12, 10587 Berlin, Germany

The Physikalisch-Technische Bundesanstalt (PTB), the German national metrology institute, has built an electron storage ring in close cooperation with BESSY for energies between 200 MeV and 600 MeV. This storage ring, named Metrology Light Source (MLS), will mainly be used for radiometry and can be operated as a primary source standard. The spectral range of the MLS is optimized for UV, EUV and also for Terahertz radiation. Commissioning is planed for May 2007. First MLS commissioning results will be reported.