Morris, D. K.

Paper Title Page
TUPAS010 Studies of Beam Properties and Main Injector Loss Control using Collimators in the Fermilab Booster to Main Injector Transfer Line 1670
 
  • B. C. Brown, P. Adamson, D. Capista, D. E. Johnson, I. Kourbanis, D. K. Morris, M.-J. Yang
    Fermilab, Batavia, Illinois
 
  Funding: Work supported by the U. S. Department of Energy under Contract No. DE-AC02-76CH03000.

High intensity operation of the Fermilab Main Injector has resulted in increased activation of machine components. Efforts to permit operation at high power include creation of collimation systems to localize losses away from locations which require maintenance. As a first step, a collimation system to remove halo from the incoming beam was installed in the Spring 2006 Facility Shutdown*. We report on commissioning studies and operational experience including observations of Booster beam properties, effects on Main Injector loss and activation, and operational results.

* B. C. Brown, et al., "Collimation System for the Fermilab Booster to Main Injector Transfer Line", this conference.