TUPAS102 End-to-End Simulation for the EBIS Preinjector 1874
 
  • D. Raparia, J. G. Alessi, A. Kponou, A. I. Pikin, J. Ritter
    BNL, Upton, Long Island, New York
  • S. Minaev, U. Ratzinger, A. Schempp, R. Tiede
    IAP, Frankfurt am Main
 
  Funding: This manuscript has been authored by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH1-886 with the U. S. Department of Energy. .

The EBIS (Electron Beam Ion Source) Project at Brookhaven National Laboratory is in the second year of a four-year project. It will replace the Tandem Van de Graaff accelerators with an EBIS, an RFQ, and one IH Linac cavity as the heavy ion preinjector for the Relativistic Heavy Ion Collider (RHIC), and for the NASA Space Radiation Laboratory (NSRL). The preinjector will provide all ions species, He to U, (Q/m>0.16) at 2 MeV/amu at a repetition rate of 5 Hz, pulse length of 10–40 μs, and intensities of ~2.0 mA. End-to-end simulations (from EBIS to the Booster injection) as well as error sensitivity studies will be presented and physics issues will be discussed.

#Raparia@bnl.gov

 
TUPAN017 Development of a Coupled CH Structure for the GSI Proton Injector 1428
 
  • G. Clemente, H. Podlech, U. Ratzinger, R. Tiede
    IAP, Frankfurt am Main
  • L. Groening
    GSI, Darmstadt
  • S. Minaev
    ITEP, Moscow
 
  Funding: CARE (contract No RIICT-2003-506-395), GSI, BMBF

The FAIR facility, under development at GSI, needs a new dedicated proton injector for the production of intense antiprotons secondary beams. This injector will accelerate protons from 3 to 70 MeV at a current of 70 mA, and due to the high voltage gain and shunt impedance will be based on CH cavities powered by a 2.5 MW, 325 MHz klystron. An innovative coupling cell containing one drift tube of length N-beta λ was developed to combine multicell drift tube modules of the CH-type (H210 mode).. In order to study this innovative coupling mechanism a scaled model of the second resonator of GSI Proton injector is under production at IAP. The according full scale prototype, 3 meter long coupled X MV resonator from MeV to MeV is under construction and will be power tested with a 2.5 MW klystron at GSI at the end of 2008. This paper describes in detail the coupled structure together with a general overview of the R&D results achieved on the CH-DTL's cavity.