A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Martin, D. J.

Paper Title Page
FRPMS084 Detection of Instumental Drifts in the PEP II LER BPM System 4261
 
  • W. Wittmer, A. S. Fisher, D. J. Martin, J. J. Sebek
    SLAC, Menlo Park, California
 
  Funding: US-DOE

During the last PEP-II run a major goal was to bring the Low-Energy Ring optics as close as possible to the design. Sudden artificial jumps of the orbit, which were regularly observed by a large number of BPMs during routine operation, were interfering with this effort. The source of the majority of these jumps had been traced to the filter-isolator boxes (FIBs) near the BPM buttons. A systematic approach to find and repair the failing units had been developed and implemented. Despite this effort, the instrumental orbit jumps never completely disappeared. To trace the source of this behavior a test setup, using a spare Bergoz MX-BPM processor (kindly provided by SPEAR III at SSRL) was connected in parallel to various PEP-II BPM processors. In the course of these measurements a slow instrumental orbit drift was found which was clearly not induced by a moving positron beam. Based on the size of the system and the limited time before the end of PEP II an accelerator improvement project was initiated to install BERGOZ BPM-MX processors close to all sextupoles.