A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Marchetti, C.

Paper Title Page
TUPAN033 DAΦ NE Setup and Performances During the Second FINUDA Run 1457
 
  • C. Milardi, D. Alesini, M. E. Biagini, C. Biscari, R. Boni, M. Boscolo, B. Buonomo, A. Clozza, G. O. Delle Monache, T. Demma, E. Di Pasquale, G. Di Pirro, A. Drago, A. Gallo, A. Ghigo, S. Guiducci, M. Incurvati, P. Iorio, C. Ligi, F. Marcellini, C. Marchetti, G. Mazzitelli, L. Pellegrino, M. A. Preger, L. Quintieri, P. Raimondi, R. Ricci, U. Rotundo, C. Sanelli, M. Serio, F. Sgamma, B. Spataro, A. Stecchi, A. Stella, S. Tomassini, C. Vaccarezza, M. Zobov
    INFN/LNF, Frascati (Roma)
  • J. D. Fox, D. Teytelman
    SLAC, Menlo Park, California
  • E. Levichev, S. A. Nikitin, P. A. Piminov, D. N. Shatilov
    BINP SB RAS, Novosibirsk
 
  Beam operations on DAΦNE restarted on October 2006 after a four months shut-down to remove the KLOE experimental detector and to install the FINUDA one. This period has been also used for maintenance and implementation of several upgrades. In the first two months of operation the peak and integrated luminosity already exceeds the values obtained during the first FINUDA run by 20%. The DAΦNE goal is to deliver 1 fb-1 integrated luminosity by the end of May 2007. The collider performances during the run are presented together with the improvements obtained in terms of ring nonlinearities and beam dynamics coming from several collider modifications.