A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Malafronte, A. A.

Paper Title Page
THPMN003 Commissioning of the 100 keV Beam Stage of the Injector Linac of the IFUSP Microtron 2710
 
  • M. N. Martins, A. L. Bonini, R. Lima, A. A. Malafronte, T. F. Silva
    USP/LAL, Sao Paulo
 
  Funding: Work supported by FAPESP and CNPq

The injector linac consists of a beam conforming stage, with chopper and buncher systems, and two acceleration structures, the first one with variable β, and the second one divided into two parts with different β. There are two 3-mm diameter collimators, the first at the entrance to the first chopper cavity and the second at the entrance to the first acceleration structure. The beam focalization is made by solenoids, and correcting coils are provided for steering. In this work we describe the commissioning of the optical lattice of the conforming beam stage. The first beam images are shown.

 
FRPMN010 Emittance Measurements at the 100 keV Beam Stage of the Injector Linac of the IFUSP Microtron 3898
 
  • T. F. Silva, A. A. Malafronte, M. N. Martins
    USP/LAL, Sao Paulo
 
  Funding: Work supported by FAPESP and CNPq

In this work we describe the determination of the beam emittance for the 100-keV injector of the IFUSP racetrack microtron. We measured the beam spot diameter at a fluorescent screen located 40 cm after a 3-mm diameter collimator (placed at the entrance to the first chopper cavity). A solenoid lens located upstream to the collimator was used to produce a beam waist at the fluorescent screen position. We used the collimator and the beam waist sizes to calculate the emittance for 80 and 90 keV beams. Results showed no dependence with energy, indicating that the collimator is limiting the beam emittance at 2.32(5) ??mm?mrad.