Makulski, A.

Paper Title Page
MOPAS006 Design and Fabrication of a Multi-element Corrector Magnet for the Fermilab Booster Synchrotron 452
 
  • D. J. Harding, J. DiMarco, C. C. Drennan, V. S. Kashikhin, S. Kotelnikov, J. R. Lackey, A. V. Makarov, A. Makulski, R. Nehring, D. F. Orris, E. Prebys, P. Schlabach, G. Velev, D. G.C. Walbridge
    Fermilab, Batavia, Illinois
 
  Funding: Work supported by the U. S. Department of Energy under Contract No. DE-AC02-76CH03000.

To better control the beam position, tune, and chromaticity in the Fermilab Booster synchrotron, a new package of six corrector elements has been designed, incorporating both normal and skew orientations of dipole, quadrupole, and sextupole magnets. The devices are under construction and installation at 48 locations is planned. The density of elements and the rapid slew rate have posed special challenges. The magnet construction is presented along with DC measurements of the magnetic field.

 
WEPMN105 Fast Thermometry for Superconducting RF Cavity Testing 2280
 
  • D. F. Orris, L. Bellantoni, R. H. Carcagno, H. Edwards, E. R. Harms, T. N. Khabiboulline, S. Kotelnikov, A. Makulski, R. Nehring, Y. M. Pischalnikov
    Fermilab, Batavia, Illinois
 
  Funding: Work supported by Universities Research Association Inc. under Contract No. DE-AC02-76CH03000 with the United States Department of Energy.

Fast readout of strategically placed low heat capacity thermometry can provide valuable information of Superconducting RF (SRF) cavity performance. Such a system has proven very effective for the development and testing of new cavity designs. Recently, several RTDs were installed in key regions of interest on a new 9 cell 3.9 GHz SRF cavity with integrated HOM design at FNAL. A data acquisition system was developed to read out these sensors with enough time and temperature resolution to measure temperature changes on the cavity due to heat generated from multipacting or quenching within power pulses. The design and performance of this fast thermometry system will be discussed along with results from tests of the 9 cell 3.9GHz SRF cavity.

 
WEPMN108 A Technique for Monitoring Fast Tuner Piezoactuator Preload Forces for Superconducting RF Cavities 2289
 
  • Y. M. Pischalnikov, J. Branlard, R. H. Carcagno, B. Chase, H. Edwards, A. Makulski, M. McGee, R. Nehring, D. F. Orris, V. Poloubotko, C. Sylvester, S. Tariq
    Fermilab, Batavia, Illinois
 
  Funding: Work supported by Universities Research Association Inc. under Contract No. DE-AC02-76CH03000 with the United States Department of Energy.

The technology for mechanically compensating Lorentz Force detuning in superconducting RF cavities has already been developed at DESY. One technique is based on commercial piezoelectric actuators and was successfully demonstrated on TESLA cavities*. Piezo actuators for fast tuners can operate in a frequency range up to several kHz; however, it is very important to maintain a constant preload force on the piezo stack in the range of 10 to 50% of its specified blocking force. Determining the preload force during cooldown, warm-up, or re-tuning of the cavity is difficult without instrumentation, and exceeding the specified range can permanently damage the piezo stack. A technique based on strain gauge technology for superconducting magnets has been applied to fast tuners for monitoring the preload on the piezoelectric assembly. This paper will address the design and testing of piezo actuator preload sensor technology. Results from measurements of preload sensors installed on the tuner of the DESY Capture Cavity II tested at Fermilab will be presented. These results include measurements during cooldown, warm-up, and cavity tuning along with dynamic Lorentz force compensation.

* M. Liepe et al," Dynamic Lorentz Force Compensation with a Fast Piezoelectric Tuner" PAC2001

 
WEPMN092 Capture Cavity II Results at FNAL 2245
 
  • J. Branlard, G. I. Cancelo, R. H. Carcagno, B. Chase, H. Edwards, R. P. Fliller, B. M. Hanna, E. R. Harms, A. Hocker, T. W. Koeth, M. J. Kucera, A. Makulski, U. Mavric, M. McGee, A. H. Paytyan, Y. M. Pischalnikov, P. S. Prieto, R. Rechenmacher, J. Reid, K. R. Treptow, N. G. Wilcer, T. J. Zmuda
    Fermilab, Batavia, Illinois
 
  Funding: FRA

As part of the research and development towards the International Linear Collider (ILC), several test facilities have been developed at Fermilab. This paper presents the latest LLRF results obtained with Capture Cavity II at these test facilities. The main focus will be on controls and RF operations using the SIMCON based LLRF system. Details about hardware upgrades and overall system performance will be also explained. Finally, design considerations and objectives for the future test facility at the New Muon Laboratory (NML) will be presented.