Luo, Y.

Paper Title Page
TUOCC02 Progress in Tune, Coupling, and Chromaticity Measurement and Feedback during RHIC Run 7 886
 
  • P. Cameron, J. Cupolo, W. C. Dawson, C. Degen, A. Della Penna, L. T. Hoff, Y. Luo, A. Marusic, R. Schroeder, C. Schultheiss, S. Tepikian
    BNL, Upton, Long Island, New York
  • M. Gasior
    CERN, Geneva
 
  Funding: US DOE

Tune feedback was first implemented in RHIC in 2002 as a specialist activity. The transition to full operational status was impeded by dynamic range problems, as well as by overall loop instabilities driven by large coupling. The dynamic range problem was solved by the CERN development of the Direct Diode Detection Analog Front End. Continuous measurement of all projections of the betatron Eigenmodes made possible the world's first implementation of coupling feedback during beam acceleration, resolving the problem of overall loop instabilites. Simultaneous tune and coupling feedbacks were utilized as specialist activities for ramp development during the 2006 RHIC run. At the beginning of the 2007 RHIC run there remained two obstacles to making these feedbacks fully operational in RHIC - chromaticity measurement and control, and the presence of strong harmonics of the power line frequency in the betatron spectrum. We report here on progress in tune, coupling, and chromaticity measurement and feedback, and discuss the relevance of our results to the LHC commissioning effort. The results of investigations of power line harmonics in RHIC are presented elsewhere in these proceedings.

 
slides icon Slides  
TUPAS094 Transverse Beam Transfer Functions of Colliding Beams in RHIC 1856
 
  • W. Fischer, M. Blaskiewicz, R. Calaga, P. Cameron, Y. Luo
    BNL, Upton, Long Island, New York
  • T. Pieloni
    CERN, Geneva
 
  Funding: Work supported by U. S. DOE under contract No DE-AC02-98CH1-886.

We use transverse beam transfer functions to measure tune distributions of colliding beams in RHIC. The tune has a distribution due to the beam-beam interaction, nonlinear magnetic fields – particularly in the interaction region magnets, and non-zero chromaticity in conjunction with momentum spread. The measured tune distributions are compared with calculations.

 
TUPAS098 RHIC Beam-Based Sextupole Polarity Verification 1868
 
  • Y. Luo, P. Cameron, A. Della Penna, T. Satogata, D. Trbojevic
    BNL, Upton, Long Island, New York
 
  Funding: Work supported by U. S. DOE under contract No DE-AC02-98CH10886.

A beam-based method was proposed and applied to check the polarities of the arc sextupoles in the Relativistic Heavy Ion Collider (RHIC) with repetitive local horizontal bumps. Wrong sextupole polarities can be easily identified from mismatched signs and amplitudes of the horizontal and vertical tune shifts from bump to bump and/or from arc to arc. This check takes less than 2 hours for both RHIC Blue and Yellow rings. Tune shifts in both planes during this study were tracked with a high-resolution baseband tunemeter (BBQ) system. This method was successfully used to the sextupole polarity check in the RHIC run06.

 
TUPAS099 A Near-Integer Working Point for Polarized Protons in the Relativistic Heavy Ion Collider 1871
 
  • C. Montag, M. Bai, J. Beebe-Wang, M. Blaskiewicz, R. Calaga, W. Fischer, A. K. Jain, Y. Luo, N. Malitsky, T. Roser, S. Tepikian
    BNL, Upton, Long Island, New York
 
  Funding: Work performed under the auspices of the US Department of Energy.

To achieve the RHIC polarized proton enhanced luminosity goal of 150*1030 cm-2 sec-1 on average in stores at 250 GeV, the luminosity needs to be increased by a factor of 3 compared to what was achieved in 2006. Since the number of bunches is already at its maximum of 111, limited by the injection kickers and the experiments' time resolution, the luminosity can only be increased by either increasing the bunch intensity and/or reducing the beam emittance. This leads to a larger beam-beam tuneshift parameter. Operation during 2006 has shown that the beam-beam interaction is already dominating the luminosity lifetime. To overcome this limitation, a near-integer working point is under study. We will present recent results of these studies.

 
TUOCKI02 Summary of the RHIC Performance during the FY07 Heavy Ion Run 722
 
  • K. A. Drees, L. Ahrens, J. G. Alessi, M. Bai, D. S. Barton, J. Beebe-Wang, M. Blaskiewicz, J. M. Brennan, K. A. Brown, D. Bruno, J. J. Butler, R. Calaga, P. Cameron, R. Connolly, T. D'Ottavio, W. Fischer, W. Fu, G. Ganetis, J. W. Glenn, M. Harvey, T. Hayes, H.-C. Hseuh, H. Huang, J. Kewisch, R. C. Lee, V. Litvinenko, Y. Luo, W. W. MacKay, G. J. Marr, A. Marusic, R. J. Michnoff, C. Montag, J. Morris, B. Oerter, F. C. Pilat, V. Ptitsyn, T. Roser, J. Sandberg, T. Satogata, C. Schultheiss, F. Severino, K. Smith, S. Tepikian, D. Trbojevic, N. Tsoupas, J. E. Tuozzolo, A. Zaltsman, S. Y. Zhang
    BNL, Upton, Long Island, New York
 
  Funding: Work performed under Contract Number DE-AC02-98CH10886 under the auspices of the US Department of Energy.

After the last successful RHIC Au-Au run in 2004 (Run-4), RHIC experiments now require significantly enhanced luminosity to study very rare events in heavy ion collisions. RHIC has demonstrated its capability to operate routinely above its design average luminosity per store of 2x1026 cm-2 s-1. In Run-4 we already achieved 2.5 times the design luminosity in RHIC. This luminosity was achieved with only 40% of bunches filled, and with β* = 1 m. However, the goal is to reach 4 times the design luminosity, 8x1026 cm-2 s-1, by reducing the beta* value and increasing the number of bunches to the accelerator maximum of 111. In addition, the average time in store should be increased by a factor of 1.1 to about 60% of calendar time. We present an overview of the changes that increased the instantaneous luminosity and luminosity lifetime, raised the reliability, and improved the operational efficiency of RHIC Au-Au operations during Run-7.

 
slides icon Slides  
TUODKI04 Accelerating Polarized Protons to 250 GeV 745
 
  • M. Bai, L. Ahrens, I. G. Alekseev, J. G. Alessi, J. Beebe-Wang, M. Blaskiewicz, A. Bravar, J. M. Brennan, K. A. Brown, D. Bruno, G. Bunce, J. J. Butler, P. Cameron, R. Connolly, T. D'Ottavio, J. DeLong, K. A. Drees, W. Fischer, G. Ganetis, C. J. Gardner, J. W. Glenn, T. Hayes, H.-C. Hseuh, H. Huang, P. F. Ingrassia, J. S. Laster, R. C. Lee, A. U. Luccio, Y. Luo, W. W. MacKay, Y. Makdisi, G. J. Marr, A. Marusic, G. T. McIntyre, R. J. Michnoff, C. Montag, J. Morris, P. Oddo, B. Oerter, J. Piacentino, F. C. Pilat, V. Ptitsyn, T. Roser, T. Satogata, K. Smith, S. Tepikian, D. Trbojevic, N. Tsoupas, J. E. Tuozzolo, M. Wilinski, A. Zaltsman, A. Zelenski, K. Zeno, S. Y. Zhang
    BNL, Upton, Long Island, New York
  • D. Svirida
    ITEP, Moscow
 
  Funding: The work was performed under the US Department of Energy Contract No. DE-AC02-98CH1-886, and with support of RIKEN(Japan) and Renaissance Technologies Corp.(USA)

The Relativistic Heavy Ion Collider~(RHIC) as the first high energy polarized proton collider was designed to provide polarized proton collisions at a maximum beam energy of 250GeV. It has been providing collisions at a beam energy of 100GeV since 2001. Equipped with two full Siberian snakes in each ring, polarization is preserved during the acceleration from injection to 100GeV with careful control of the betatron tunes and the vertical orbit distortions. However, the intrinsic spin resonances beyond 100GeV are about a factor of two stronger than those below 100GeV making it important to examine the impact of these strong intrinsic spin resonances on polarization survival and the tolerance for vertical orbit distortions. Polarized protons were accelerated to the record energy of 250GeV in RHIC with a polarization of 45\% measured at top energy in 2006. The polarization measurement as a function of beam energy also shows some polarization loss around 136GeV, the first strong intrinsic resonance above 100GeV. This paper presents the results and discusses the sensitivity of the polarization survival to orbit distortions.

 
slides icon Slides  
FRPMS109 Measurement and Correction of Third Resonance Driving Term in the RHIC 4351
 
  • Y. Luo, M. Bai, J. Bengtsson, R. Calaga, W. Fischer, N. Malitsky, F. C. Pilat, T. Satogata
    BNL, Upton, Long Island, New York
 
  Funding: Work supported by U. S. DOE under contract No DE-AC02-98CH10886.

To further improve the polarized proton (pp) run collision luminosity in the Relativistic Heavy Ion Collider, correction of the horizontal two-third resonance is desirable to increase the available tune space. The third resonance driving term (RTD) is measured with the turn-by-turn (TBT) beam position monitor (BPM) data with AC dipole excitation. A first order RTD response matrix based on the optics model is used to on-line compensate the third resonance driving term h30000 while keeping other first order RTDs and first order chromaticities unchanged. The results of beam experiment and simulation correction are presented and discussed.

 
FRPMS110 Online Nonlinear Chromaticity Correction Using Off-Momentum Tune Response Matrix 4357
 
  • Y. Luo, W. Fischer, N. Malitsky, S. Tepikian, D. Trbojevic
    BNL, Upton, Long Island, New York
 
  Funding: Work supported by U. S. DOE under contract No DE-AC02-98CH10886.

With 8 arc sextupole families in each RHIC ring, the nonlinear chromaticities can be corrected on-line by matching the off-momentum tunes onto the wanted off-momentum tunes with linear chromaticity only. The Newton method with singular value decomposition (SVD) technique is used for this multi-dimensional nonlinear optimization, where the off-momentum tune response matrix with respect to sextupole strength changes is adopted to simplify and fasten the on-line optimization process. The off-momentum tune response matrix can be calculated with the on-line accelerator optics model or directly measured with the real beam. This correction method will be verified and used in the coming RHIC run'07.

 
FRPMS111 Dynamic Aperture Evaluation at the Current Working Point for RHIC Polarized Proton Operation 4363
 
  • Y. Luo, M. Bai, J. Beebe-Wang, W. Fischer, A. K. Jain, C. Montag, T. Roser, S. Tepikian, D. Trbojevic
    BNL, Upton, Long Island, New York
 
  Funding: Work supported by U. S. DOE under contract No DE-AC02-98CH10886.

To further improve the the polarized proton (pp) luminosity in the Relativistic Heavy Ion Collider, the beta functions at the two interaction points (IPs) will be reduced from 1.0 m to 0.9m in 2007. In addition, it is planned to increase the bunch intensity from 1.5*1011 to 2.0*1011. To accommodate these changes, the nonlinear chromaticities and the third resonance driving term should be corrected. In 2007, the number of the arc sextupole power supplies will be doubled from 12 to 24, which allows nonlinear chromaticity correction. With the updated field errors in the interaction regions (IRs), detailed dynamic aperture studies are carried out to optimize the nonlinear correction schemes, and increase the available tune space in collision.