A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Lonza, M.

Paper Title Page
MOPAN024 Commissioning of the ELETTRA Fast Orbit Feedback System 203
 
  • M. Lonza, D. Bulfone, V. Forchi', G. Gaio
    ELETTRA, Basovizza, Trieste
 
  A fast orbit feedback system has been installed at ELETTRA. It globally corrects the closed orbit at 10 kHz rate using all the BPMs and corrector magnets of the storage ring. The Libera Electron device has been used to upgrade the original detectors in order to provide micrometric accuracy and fast data rate of the beam position measurements. The article reports the experience gained during the commissioning of the system and the first operational results.  
TUPMN032 The New Elettra Booster Injector 983
 
  • M. Svandrlik, S. Bassanese, A. Carniel, K. Casarin, D. Castronovo, P. Craievich, G. D'Auria, R. De Monte, P. Delgiusto, S. Di Mitri, A. Fabris, R. Fabris, M. Ferianis, F. Giacuzzo, F. Iazzourene, G. L. Loda, M. Lonza, F. M. Mazzolini, D. M. Molaro, G. Pangon, C. Pasotti, G. Penco, L. Pivetta, L. Rumiz, C. Scafuri, G. Tromba, A. Vascotto, R. Visintini, D. Zangrando
    ELETTRA, Basovizza, Trieste
  • L. Picardi, C. Ronsivalle
    ENEA C. R. Frascati, Frascati (Roma)
 
  The new full energy injector for Elettra is under construction. The complex is made of a 100 MeV linac and a 2.5 GeV synchrotron, at 3 Hz repetition rate. With the new injector top-up operation shall be feasible. In the first semester of 2007 the machine assembly has been performed. In Summer 2007 the commissioning is scheduled, while in Fall 2007 the connection to the Storage Ring is planned. The status of the project will be reported in this paper.