A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Lettry, J.

Paper Title Page
MOPAS094 A High-Power Target Experiment at the CERN PS 646
 
  • H. G. Kirk
    BNL, Upton, Long Island, New York
  • J. R.J. Bennett
    STFC/RAL/ASTeC, Chilton, Didcot, Oxon
  • O. Caretta, P. Loveridge
    STFC/RAL, Chilton, Didcot, Oxon
  • A. J. Carroll, V. B. Graves, P. T. Spampinato
    ORNL, Oak Ridge, Tennessee
  • I. Efthymiopoulos, A. Fabich, F. Haug, J. Lettry, M. Palm
    CERN, Geneva
  • K. T. McDonald
    PU, Princeton, New Jersey
  • N. V. Mokhov, S. I. Striganov
    Fermilab, Batavia, Illinois
 
  We test a target concept of a free-flowing mercury stream embedded in a high-field solenoid. The goal is to demonstrate the copious production of secondary pions and tertiary muons in a megawatt class proton beam at the front end of a neutrino factory or muon collider. Key components are described and results of the experimental commissioning phase are given.  
TUPAN108 LHC Collimation System Hardware Commissioning 1625
 
  • Th. Weiler, O. Aberle, R. W. Assmann, R. Chamizo, Y. Kadi, J. Lettry, S. Redaelli
    CERN, Geneva
 
  The stored energy and intensity of the LHC beam exceed the damage level of the machine and the quench level of the magnets by far. Therefore a robust and reliable collimation system is required which prevents the quenching of the magnets during regular operation and protects the accelerator components from damage in the event of beam loss. To assure that the installed collimators will protect the machine and permit the required performance of the collider, an appropriate hardware commissioning has to be implemented. In this contribution we describe the procedures for the hardware commissioning of the LHC collimation system. These procedures will establish the required precision and reliability of collimator movements and settings before the start of beam operation.