WEPMS075 Development and Testing of High Power RF Vector Modulators 2508
 
  • Y. W. Kang, M. S. Champion, T. W. Hardek, S.-H. Kim, M. P. McCarthy, A. V. Vassioutchenko, J. L. Wilson
    ORNL, Oak Ridge, Tennessee
 
  Funding: This work was supported by SNS through UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U. S. Department of Energy.

High power vector modulators can allow a fan-out RF power distribution system that can power many accelerating cavities from a single high-power klystron amplifier. The configuration enables independent control of amplitudes and phases of RF voltages at the cavities. A vector modulator employs either one or two hybrids with two fast phase shifters. Prototype high power RF vector modulators employing a hybrid and two fast ferrite phase shifters in coaxial TEM transmission lines for 402.5 MHz and 805 MHz are built and tested. RF properties of the design and result of high power testing are presented.

 
WEPMS076 Status of the SNS Cryomodule Test 2511
 
  • S.-H. Kim, I. E. Campisi, F. Casagrande, M. T. Crofford, Y. W. Kang, Z. Kursun, D. Stout, A. V. Vassioutchenko
    ORNL, Oak Ridge, Tennessee
 
  Funding: SNS is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U. S. Department of Energy

The cryomodule tests are on going to have better understandings of physics as a whole and eventually to provide safe and reliable operation for neutron production. Some features are revealed to be interesting issues and need more attentions than expected, such as operating condition, collective effects between cavities, HOM coupler issues, end-group stability, cavity-coupler interactions, and vacuum/gas physics, waiting for more investigations. Up to now SNS cryomodules were mainly tested at 4.4 K, 10 pulse per second (pps) and 30 pps/60 pps tests are under progress. This paper presents the experiences and the observations during tests of cryomodules.

 
MOPAS079 Spallation Neutron Source (SNS) High Pulse Repetition Rate Considerations 614
 
  • M. P. McCarthy, D. E. Anderson, I. E. Campisi, F. Casagrande, R. I. Cutler, G. W. Dodson, J. Galambos, D. P. Gurd, Y. W. Kang, K.-U. Kasemir, S.-H. Kim, H. Ma, B. W. Riemer, J. P. Schubert, M. P. Stockli
    ORNL, Oak Ridge, Tennessee
 
  Funding: SNS is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U. S. Department of Energy.

Increasing the pulse repetition rate (PRR) of the SNS Linac to its designed maximum of 60 Hz to provide 1.4 MW of beam on target is in progress. Operation above 60 Hz in the future to provide beam to a second target is also being considered. Increasing the PRR to 80 Hz would allow the additional pulses to be diverted to a second target. This paper discusses the impact of increasing the PRR on the SNS infrastructure including Radio Frequency (RF) systems and structures, the ion source, cryogenics, controls and the target.

 
WEPMS072 Status and Performance of the Spallation Neutron Source Superconducting Linac 2502
 
  • I. E. Campisi, S. Assadi, F. Casagrande, M. S. Champion, M. T. Crofford, G. W. Dodson, J. Galambos, M. Giannella, S. Henderson, M. P. Howell, Y. W. Kang, K.-U. Kasemir, S.-H. Kim, Z. Kursun, P. Ladd, H. Ma, D. Stout, W. H. Strong, Y. Zhang
    ORNL, Oak Ridge, Tennessee
 
  Funding: SNS is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U. S. Department of Energy

The Superconducting Linac at SNS has been operating with beam for almost two years. As the first operational pulsed superconducting linac, many of the aspect of its performance were unknown and unpredictable. A lot of experience has been gathered during the commissioning of its components, during the beam turn on and during operation at increasingly higher beam power. Some cryomodules have been cold for well over two years and have been extensively tested. The operation has been consistently conducted at 4.4 K and 10 and 15 pulses per second, with some cryomodules tested at 30 and 60 pps and some tests performed at 2 K. Careful balance between safe operational limits and the study of conditions, parameters and components that create physical limits has been achieved. This paper presents the experience and the performance of the superconducting cavities and of the associated systems with and without beam.