A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Kelsey, C. T.

Paper Title Page
MOPAS047 LANSCE Fail Safe Radiation Shutter Design for Isotope Production Facility 539
 
  • M. J. Borden, C. A. Chapman, C. T. Kelsey, J. F. O'Hara, J. Sturrock
    LANL, Los Alamos, New Mexico
 
  Funding: Work supported by the United States Department of Energy, National Nuclear Security Agency, under contract DE-AC52-06NA25396

Dose rate modeling and post irradiation measurements of the Isotope Production Facility beamline, at the Los Alamos Neutron Science Center (LANSCE) accelerator, have determined that a radiation shielding shutter is required to protect personnel from shine from irradiated targets for routine beam tunnel entries. This paper will describe radiation dose modeling, shielding calculations and the failsafe mechanical shutter design.