A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Kawamura, M.

Paper Title Page
WEPMN039 Performance of J-PARC Linac RF System 2128
 
  • T. Kobayashi
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • S. Anami, Z. Fang, Y. Fukui, M. Kawamura, S. Michizono, K. Nanmo, S. Yamaguchi
    KEK, Ibaraki
  • E. Chishiro, T. Hori, H. Suzuki, M. Yamazaki
    JAEA, Ibaraki-ken
 
  High power operation of all the RF systems of J-PARC linac was started for the cavity conditioning in October 2006. Twenty 324-MHz klystrons have powered the accelerating cavities successfully, and the beam commissioning was started in November 2006. The performance of the RF drive and control system will be presented.