MOZBKI03 The JLab 12 GeV Energy Upgrade of CEBAF for QCD and Hadronic Physics 58
 
  • L. S. Cardman, L. Harwood
    Jefferson Lab, Newport News, Virginia
 
  Funding: Authored by Jefferson Science Associates, LLC under U. S. DOE Contract No. DE-AC05-06OR23177

CEBAF is a 5-pass, recirculating cw electron linac operating at ~6 GeV. The 12-GeV Upgrade is a $300M project anticipated to receive Critical Decision 2 approval in late summer of 2007 and begin construction activities in 2008; funding for the project is provided by the DOE Office of Nuclear Physics which will double the beam energy. The new energy reach will permit significant extensions in research into non-perturbative aspects of QCD. Areas of interest are Generalized Parton Distributions (GPDs), measurements at high-xBjorken, and the use of hybrid mesons to explore the nature of quark confinement. The upgrade includes: doubling the accelerating voltages of the linacs by adding 10 new high-performance cryomodules plus the requisite expansion of the 2K cryogenics plant and rf power systems, upgrading the beam transport system from 6 GeV to 12 GeV capability through extensive re-use of existing hardware, adding one recirculation arc, adding a new experimental area and the beamline to it, building new experimental equipment for the GPD, high-xBjorken, and hybrid mesons programs. The presentation will touch on the science and give some details of the accelerator plans.

 
slides icon Slides