TUPMN029 Linac Upgrading Program for the Fermi Project : Status and Perspectives 977
 
  • G. D'Auria, D. Bacescu, L. Badano, C. Bontoiu, F. Cianciosi, P. Craievich, M. B. Danailov, S. Di Mitri, M. Ferianis, G. C. Pappas, G. Penco, A. Rohlev, A. Rubino, L. Rumiz, S. Spampinati, M. Trovo, A. Turchet, D. Wang
    ELETTRA, Basovizza, Trieste
 
  FERMI@ELETTRA is a soft X-ray forth generation light source under development at the ELETTRA laboratory. It will be based on the existing 1.0 GeV Linac, revised and upgraded to fulfil the stringent requirements expected from the machine. The overall time schedule of the project is very tight and ambitious, foreseeing to supply 10 nm photons to users within 2010. Here the machine upgrading program and the ongoing activities are presented and discussed.  
TUPMN032 The New Elettra Booster Injector 983
 
  • M. Svandrlik, S. Bassanese, A. Carniel, K. Casarin, D. Castronovo, P. Craievich, G. D'Auria, R. De Monte, P. Delgiusto, S. Di Mitri, A. Fabris, R. Fabris, M. Ferianis, F. Giacuzzo, F. Iazzourene, G. L. Loda, M. Lonza, F. M. Mazzolini, D. M. Molaro, G. Pangon, C. Pasotti, G. Penco, L. Pivetta, L. Rumiz, C. Scafuri, G. Tromba, A. Vascotto, R. Visintini, D. Zangrando
    ELETTRA, Basovizza, Trieste
  • L. Picardi, C. Ronsivalle
    ENEA C. R. Frascati, Frascati (Roma)
 
  The new full energy injector for Elettra is under construction. The complex is made of a 100 MeV linac and a 2.5 GeV synchrotron, at 3 Hz repetition rate. With the new injector top-up operation shall be feasible. In the first semester of 2007 the machine assembly has been performed. In Summer 2007 the commissioning is scheduled, while in Fall 2007 the connection to the Storage Ring is planned. The status of the project will be reported in this paper.