Clemente, G.

Paper Title Page
TUPAN017 Development of a Coupled CH Structure for the GSI Proton Injector 1428
 
  • G. Clemente, H. Podlech, U. Ratzinger, R. Tiede
    IAP, Frankfurt am Main
  • L. Groening
    GSI, Darmstadt
  • S. Minaev
    ITEP, Moscow
 
  Funding: CARE (contract No RIICT-2003-506-395), GSI, BMBF

The FAIR facility, under development at GSI, needs a new dedicated proton injector for the production of intense antiprotons secondary beams. This injector will accelerate protons from 3 to 70 MeV at a current of 70 mA, and due to the high voltage gain and shunt impedance will be based on CH cavities powered by a 2.5 MW, 325 MHz klystron. An innovative coupling cell containing one drift tube of length N-beta λ was developed to combine multicell drift tube modules of the CH-type (H210 mode).. In order to study this innovative coupling mechanism a scaled model of the second resonator of GSI Proton injector is under production at IAP. The according full scale prototype, 3 meter long coupled X MV resonator from MeV to MeV is under construction and will be power tested with a 2.5 MW klystron at GSI at the end of 2008. This paper describes in detail the coupled structure together with a general overview of the R&D results achieved on the CH-DTL's cavity.