Paper | Title | Page |
---|---|---|
WEPMN039 | Performance of J-PARC Linac RF System | 2128 |
|
||
High power operation of all the RF systems of J-PARC linac was started for the cavity conditioning in October 2006. Twenty 324-MHz klystrons have powered the accelerating cavities successfully, and the beam commissioning was started in November 2006. The performance of the RF drive and control system will be presented. |