THPMN063 CTF3 Combiner Ring Commissioning 2850
 
  • F. Tecker, R. Corsini, S. Doebert, P. K. Skowronski, P. Urschutz
    CERN, Geneva
  • C. Biscari, A. Ghigo
    INFN/LNF, Frascati (Roma)
  • E. Bressi
    CNAO Foundation, Milan
  • A. Ferrari
    UU/ISV, Uppsala
 
  CLIC Test Facility 3 (CTF3) has the objective to demonstrate the remaining feasibility issues of the CLIC two-beam technology for a future multi-TeV linear collider. One key issue is the efficient generation of a very high current 'drive beam' that serves as the power source for the acceleration of the main beam to high energy. This large current beam is produced by interleaving bunches in a combiner ring using transverse deflecting RF cavities. The 84 m long CTF3 combiner ring and the connecting transfer line have been recently installed and put into operation. The latest commissioning results will be presented.