A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Bossi, F.

Paper Title Page
MOOBKI02 DAΦ NE Phi-Factory Upgrade for Siddharta Run 66
 
  • M. E. Biagini, D. Alesini, D. Babusci, R. Boni, M. Boscolo, F. Bossi, B. Buonomo, A. Clozza, G. O. Delle Monache, T. Demma, G. Di Pirro, A. Drago, A. Gallo, S. Guiducci, C. Ligi, F. Marcellini, G. Mazzitelli, C. Milardi, F. Murtas, L. Pellegrino, M. A. Preger, L. Quintieri, P. Raimondi, R. Ricci, U. Rotundo, C. Sanelli, G. Sensolini, M. Serio, F. Sgamma, B. Spataro, A. Stecchi, A. Stella, S. Tomassini, C. Vaccarezza, M. Zobov
    INFN/LNF, Frascati (Roma)
  • S. Bettoni
    CERN, Geneva
  • I. Koop, E. Levichev, P. A. Piminov, D. N. Shatilov, V. V. Smaluk
    BINP SB RAS, Novosibirsk
  • K. Ohmi
    KEK, Ibaraki
 
  An upgrade of the DAΦNE Phi-Factory at LNF is foreseen in view of the installation of the Siddharta detector in 2007. A new Interaction Region suitable to test the large crossing angle and crabbed waist collision schemes* will be installed. Other machine improvements, such as wigglers modifications, new injection kickers and chambers coating will be realized with the goal of reaching luminosity of the order of 1033/cm2/s. The principle of operation of the new scheme, together with hardware designs and simulation studies, will be presented.

*DAPHNE Upgrade Team, "DAPHNE Upgrade for Siddharta run", DAPHNE Tech. Note G-68, LNF-INFN, Dec. 2006

 
slides icon Slides