A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Bonnema, E. C.

Paper Title Page
THIAKI02 The US Industrial ILC RF Unit Cost Study 2671
 
  • E. C. Bonnema
    Meyer Tool & MFG, Oak Lawn, Illinois
  • J. J. Sredniawski
    AES, Medford, NY
 
  A major goal of the ILC Global Design Effort (GDE) is to produce an ILC Reference Design Report and an ILC Technical Design Report. Physicists and policy-makers will use these reports to decide the future of the project. As part of these reports detailed concept, performance assessments, reliable international costing, an industrialization plan, siting analysis, as well as detector concepts and scope must be developed. As part of this effort, a contract for an industrial cost study for fabrication of the Cryomodules and RF Power Systems that make up the RF units of the ILC was commissioned to Advanced Energy Systems and their team partners, CPI and Meyer Tool. This presentation will discuss the methodology of the industrial cost study and summarize important assumptions. The public results and key cost drivers will be presented.  
slides icon Slides