A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Benedikt, M.

Paper Title Page
TUODKI02 Optics Considerations for the PS2 739
 
  • M. Benedikt, W. Bartmann, C. Carli, B. Goddard, S. Hancock, J. M. Jowett, Y. Papaphilippou
    CERN, Geneva
 
  CERN envisages replacing the existing Proton Synchrotron (PS) with a larger synchrotron (PS2) capable of injecting at higher energy into the SPS. Since it should increase the performance not only of the LHC but also CNGS and other users of beams from CERN's hadron injector complex, the new accelerator must retain much of the flexibility of the present complex. A number of candidate optics, with and without transition crossing, have been evaluated systematically and compared.  
slides icon Slides  
TUPAN094 PS2 Injection, Extraction and Beam Transfer Concepts 1598
 
  • B. Goddard, W. Bartmann, M. Benedikt, A. Koschik, T. Kramer
    CERN, Geneva
 
  The replacement of CERN's existing 26 GeV Proton Synchrotron (PS) machine with a separated-function synchrotron PS2 has been identified as an important part of the possible future upgrade programme of the CERN accelerator complex. The PS2 will require a number of new beam transfer systems associated with injection, extraction, beam dumping and transfer. The different requirements are briefly presented, together with an overview of the conceptual design of these systems, based on the initial PS2 parameter set. The required equipment sub-system performance is derived and discussed. Possible limitations are analysed and the impact on the overall design and parameter set is discussed.