A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Balhan, B.

Paper Title Page
TUPAN098 Beam Commissioning of the SPS LSS6 Extraction and TT60 for LHC 1610
 
  • B. Goddard, B. Balhan, E. H.R. Gaxiola, M. Gourber-Pace, L. K. Jensen, V. Kain, A. Koschik, T. Kramer, J. A. Uythoven, H. Vincke, J. Wenninger
    CERN, Geneva
 
  The new fast extraction system in LSS6 of the SPS and the first 100 m of transfer line TT60 was commissioned with low intensity beam in late 2006. The layout and functionality of the main elements are briefly explained, including the various hardware subsystems and the control system. The systems safety procedures, test objectives and measurements performed during the beam commissioning are described.  
THPMN005 Technical Challenges for Head-On Collisions and Extraction at the ILC 2716
 
  • O. Napoly, O. Delferriere, M. Durante, J. Payet, C. Rippon, D. Uriot
    CEA, Gif-sur-Yvette
  • M. Alabau, P. Bambade, J. Brossard, O. Dadoun, C. Rimbault
    LAL, Orsay
  • D. A.-K. Angal-Kalinin, F. Jackson, S. I. Tzenov
    STFC/DL/ASTeC, Daresbury, Warrington, Cheshire
  • R. Appleby
    UMAN, Manchester
  • B. Balhan, J. Borburgh, B. Goddard
    CERN, Geneva
  • Y. Iwashita
    Kyoto ICR, Uji, Kyoto
  • L. Keller
    SLAC, Menlo Park, California
  • S. Kuroda
    KEK, Ibaraki
  • G. L. Sabbi
    LBNL, Berkeley, California
 
  Funding: EUROTeV Project Contract no.011899 RIDS

An interaction region with head-on collisions is considered as an alternative to the baseline ILC configuration. Progress in the final focus optics design includes engineered large bore superconducting final doublet magnets and their 3D magnetic integration in the detector solenoids. Progress on the beam separation optics is based on technical designs of electrostatic separator and special extraction quadripoles. The spent beam extraction is realized by a staged collimation scheme relying on realistic collimators. The impact on the detector background is estimated. The possibility of technical tests of the most challenging components is investigated.