MOPAN086 Final Geometry of 1232 LHC Dipoles 359
 
  • E. Y. Wildner, M. Bajko, P. Bestmann, S. D. Fartoukh, J. B. Jeanneret, D. P. Missiaen, D. Tommasini
    CERN, Geneva
 
  The 15 m long main dipoles for the Large Hadron Collider are now being installed in their final positions in the accelerator tunnel. Geometric measurements of the magnets after many of the production steps from industry to the cryostating, after cold tests and after preparation of the magnets for installation, have been made, permitting careful control of the shape of the magnet, the positioning of the field correctors, and the final positioning in the tunnel. The result of the geometry control at the different production stages, from industry to CERN, using different kinds of control procedures and analysis, will be reported.