A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Yoshida, M.

Paper Title Page
TPPP003 Lattice Upgrade Plan for Crab Crossing at the KEKB Rings 865
 
  • A. Morita, K. Egawa, K. Hosoyama, H. Koiso, T. Kubo, M. Masuzawa, K. Ohmi, K. Oide, R. Sugahara, M. Yoshida
    KEK, Ibaraki
 
  We plan to install two superconducting crab cavities into the rings at Janyary, 2006. In our plan, we will install one crab cavity per one ring into the NIKKO straight section where the cryogenic infrastructure is already operated for the superconducting accelerating cavities. In order to obtain the correct crabbing angle at the interaction point(IP), we have to enlarge the horizontal beta function(200m for HER) and have to adjust the horizontal phase advance between the IP and the cavity installation point. In this paper, we will report the lattice modified for the crab crossing and the study results about the single beam dynamics.  
WPAT008 Recent Status of RF Source in J-PARC Linac 1123
 
  • E. Chishiro, T. Hori, H. Suzuki, M. Yamazaki
    JAERI, Ibaraki-ken
  • S. Anami, S. Fukuda, Y. Fukui, M. Kawamura, S. Yamaguchi, M. Yoshida
    KEK, Ibaraki
 
  The construction of the J-PARC (Japan Proton Accelerator Research Complex) linac is under going. RF sources for the low beta linac section use 324-MHz klystrons and after the evaluation of seven prototype tubes, mass production of 20 tubes are conducted. These will be installed in the linac building from April 2005. Performances of the 324-MHz klystrons are described in this paper. The prototype klystron of 972-MHz klystron, which is planed to be installed in high beta linac section, oscillated strongly without any drive rf power, and it had been investigated to solve it. Though it was doubted to be a diode oscillation at first, recent experiment showed the drift-tube oscillation and we succeeded in stopping oscillation by deforming the integrated cavity and detuning. After this experiment, we built a new tube and started to test it. This experiment is written in this paper. Other status of construction related to the rf sources is also shown in this paper.  
WPAT053 Results of a High-Power Klystron Dip Test in the KEK Linac 3235
 
  • K. Nakao, S. Fukuda, H. Katagiri, T. Matsumoto, S. Michizono, T. Takenaka, Y. Yano, M. Yoshida
    KEK, Ibaraki
 
  Dip test, which is the measurement of a klystron heater activity, is recently adopted as the standard measurement to maintain the klystron operation in the KEK electron-positron linac. In 2003, we began to use a dip test as the quick way to measure the emission characteristics from the klystron cathode. After the successful results, we made the dedicated measuring systems and measured the dips of the cathode emission of 60 operating klystrons in KEK electron-positron linac. These data are important to estimate the klystron cathode life and used to select the candidate klystrons of replacement in the summer maintenance period.  
TPPP007 Recent Progress at KEKB 1045
 
  • Y. Funakoshi, K. Akai, K. Ebihara, K. Egawa, A. Enomoto, J.W. Flanagan, H. Fukuma, K.  Furukawa, T. Furuya, J. Haba, S. Hiramatsu, T. Ieiri, N. Iida, H. Ikeda, T. Kageyama, S. Kamada, T. Kamitani, S. Kato, M. Kikuchi, E. Kikutani, H. Koiso, M. Masuzawa, T. Mimashi, A. Morita, T.T. Nakamura, H. Nakayama, Y. Ogawa, K. Ohmi, Y. Ohnishi, N. Ohuchi, K. Oide, M. Ono, M. Shimada, S. Stanic, M. Suetake, Y. Suetsugu, T. Sugimura, T. Suwada, M. Tawada, M. Tejima, M. Tobiyama, N. Tokuda, S. Uehara, S. Uno, N. Yamamoto, Y. Yamamoto, Y. Yano, K. Yokoyama, M. Yoshida, M. Yoshida, S.I. Yoshimoto
    KEK, Ibaraki
  • F. Zimmermann
    CERN, Geneva
 
  We summarize the machine operation of KEKB during past one year. Progress for this period, causes of present performance limitations and future prospects are described.  
TPPP007 Recent Progress at KEKB 1045
 
  • Y. Funakoshi, K. Akai, K. Ebihara, K. Egawa, A. Enomoto, J.W. Flanagan, H. Fukuma, K.  Furukawa, T. Furuya, J. Haba, S. Hiramatsu, T. Ieiri, N. Iida, H. Ikeda, T. Kageyama, S. Kamada, T. Kamitani, S. Kato, M. Kikuchi, E. Kikutani, H. Koiso, M. Masuzawa, T. Mimashi, A. Morita, T.T. Nakamura, H. Nakayama, Y. Ogawa, K. Ohmi, Y. Ohnishi, N. Ohuchi, K. Oide, M. Ono, M. Shimada, S. Stanic, M. Suetake, Y. Suetsugu, T. Sugimura, T. Suwada, M. Tawada, M. Tejima, M. Tobiyama, N. Tokuda, S. Uehara, S. Uno, N. Yamamoto, Y. Yamamoto, Y. Yano, K. Yokoyama, M. Yoshida, M. Yoshida, S.I. Yoshimoto
    KEK, Ibaraki
  • F. Zimmermann
    CERN, Geneva
 
  We summarize the machine operation of KEKB during past one year. Progress for this period, causes of present performance limitations and future prospects are described.