A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Yokoyama, K.

Paper Title Page
TPPT015 Coupler Matching Techniques for C-Band Accelerating Section 1431
 
  • K. Yokoyama, M. Ikeda, K. Kakihara, T. Kamitani, S. Ohsawa, T. Sugimura, T. T. Takatomi
    KEK, Ibaraki
 
  Research and development of the c-band accelerating section has proceeded since 2002. This paper reports the development of the second prototype accelerating section. The coupler iris with a 4 mm thick is thicker than the first prototype because of preventing the rf breakdown at the iris edge. The coupler has a single port and the coupler cell is the same length as the waveguide(WR-187). The coupler cavity diameter and the coupling iris were optimized by using the iteration of the rf measurement which is the nordal shift method.  
TPPT038 Development of C-Band Accelerator Structure with Smooth Shape Couplers 2530
 
  • T. Sugimura, M. Ikeda, K. Kakihara, T. Kamitani, S. Ohsawa, T. T. Takatomi, K. Yokoyama
    KEK, Ibaraki
 
  The first C-band accelerator structure for the SuperKEKB injector linac has been operated in the beam line of e+/e- injector linac for KEKB/PF/PF-AR since September, 2003. A new accelerator structure will locate upstream of the first structure. The upstream structure is exposed to higher RF field than that of downstream structure. For the case of first structure, most of an RF breakdown occurs in an input coupler. In order to reduce a frequency of the breakdown, improvement of a coupler is required. In order to suppress a thermionic emission around the coupler iris, thick and smooth iris is adopted for the upstream structure. The development status of this type of upstream structure is described.  
TPPP007 Recent Progress at KEKB 1045
 
  • Y. Funakoshi, K. Akai, K. Ebihara, K. Egawa, A. Enomoto, J.W. Flanagan, H. Fukuma, K.  Furukawa, T. Furuya, J. Haba, S. Hiramatsu, T. Ieiri, N. Iida, H. Ikeda, T. Kageyama, S. Kamada, T. Kamitani, S. Kato, M. Kikuchi, E. Kikutani, H. Koiso, M. Masuzawa, T. Mimashi, A. Morita, T.T. Nakamura, H. Nakayama, Y. Ogawa, K. Ohmi, Y. Ohnishi, N. Ohuchi, K. Oide, M. Ono, M. Shimada, S. Stanic, M. Suetake, Y. Suetsugu, T. Sugimura, T. Suwada, M. Tawada, M. Tejima, M. Tobiyama, N. Tokuda, S. Uehara, S. Uno, N. Yamamoto, Y. Yamamoto, Y. Yano, K. Yokoyama, M. Yoshida, M. Yoshida, S.I. Yoshimoto
    KEK, Ibaraki
  • F. Zimmermann
    CERN, Geneva
 
  We summarize the machine operation of KEKB during past one year. Progress for this period, causes of present performance limitations and future prospects are described.  
TPPT011 R&D Status of C-Band Accelerating Section for SuperKEKB 1233
 
  • T. Kamitani, N. Delerue, M. Ikeda, K. Kakihara, S. Ohsawa, T. Oogoe, T. Sugimura, T. T. Takatomi, S. Yamaguchi, K. Yokoyama
    KEK, Ibaraki
  • Y. Hozumi
    GUAS/AS, Ibaraki
 
  For future energy upgrade of the KEKB injector linac, C-band accelerating section has been developed. First prototype 1-m long section has been installed in the linac and has achieved the accelerating field gradient of 42 MV/m. Developments of second prototype which has thicker coupler iris and third prototype which has smooth surface of the iris are in progress for less frequent breakdown. This paper reports on the recent R and D status of these C-band accelerating sections.