A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Torrez, P.A.

Paper Title Page
WPAT036 A 700 MHZ, 1 MW CW RF System for a FEL 100mA RF Photoinjector 2413
 
  • W. Roybal, D.C. Nguyen, W. Reass, D. Rees, P.J. Tallerico, P.A. Torrez
    LANL, Los Alamos, New Mexico
 
  Funding: U.S. Department of Energy.

This paper describes a 700 MHz, 1 Megawatt CW, high efficiency klystron RF system utilized for a Free Electron Laser (FEL) high-brightness electron photoinjector (PI). The E2V klystron is mod-anode tube that operates with a beam voltage of 95 kV. This tube, operating with a 65% efficiency, requires ~96 watts of input power to produce in excess of 1 MW of output power. This output drives the 3rd cell of a 2½-cell, p-mode PI cavity through a pair of planar waveguide windows. Coupling is via a ridge-loaded tapered waveguide section and "dog-bone" iris. This paper will present the design of the RF, RF transport, coupling, and monitoring/protection systems that are required to support CW operations of the 100 mA cesiated, semi-porous SiC photoinjector.

 
WPAT054 5 MW 805 MHz SNS RF System Experience 3280
 
  • K.A. Young, J.T. Bradley, T.W. Hardek, M.T. Lynch, D. Rees, W. Roybal, P.J. Tallerico, P.A. Torrez
    LANL, Los Alamos, New Mexico
 
  Funding: Work supported by the U.S. DOE.

The RF system for the 805 MHz normal conducting linac of the Spallation Nuetron Source (SNS) accelerator was designed, procured and tested at Los Alamos National Laboratory(LANL) and then installed and commissioned at Oak Ridge National Laboratory (ORNL). The RF power for this room temperature coupled cavity linac (CCL) of SNS accelerator is generated by four pulsed 5 MW peak power klystrons operating with a pulse width of 1.25 mSec and a 60 Hz repetition frequency. The RF power from each klystron is divided and delivered to the CCL through two separate RF windows. The 5 MW RF system advanced the state of the art for simultaneous peak and average power. This paper summarizes the problems encountered, lessons learned and results of the high power testing at LANL of the 5 MW klystrons, 5 MW circulators, 5 MW loads, and 2.5 MW windows.*

*Tom Hardek is now at ORNL.