A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Seletsky, S.

Paper Title Page
RPAT064 Beam-Based Calibration of the Electron Energy in the Fermilab Electron Cooler 3638
 
  • S. Seletsky
    Rochester University, Rochester, New York
  • A.V. Shemyakin
    Fermilab, Batavia, Illinois
 
  Electron cooling of 8.9 GeV antiprotons in the Fermilab’s Recycler ring requires precise matching of electron and antiproton velocities. While the final match can be done by optimization of the cooling process, for the very first cooling one should rely on the knowledge of absolute values of electron and antiproton energies. The upper limit for the energy uncertainty of both beams is determined by the Recycler’s momentum aperture and is equal to 0.3%. The paper discusses a method of the electron energy calibration that is based on the measurement of the electron’s Larmor wavelength in the field of the cooling section solenoid. The method was tested in an 18 m long cooling section prototype with 3.5 MeV electrons. An accuracy of 0.3% was demonstrated.  
RPAT069 Electron Beam Size Measurements in a Cooling Solenoid 3801
 
  • T.K. Kroc, T.B. Bolshakov, A.V. Burov, A.V. Shemyakin
    Fermilab, Batavia, Illinois
  • S. Seletsky
    Rochester University, Rochester, New York
 
  Funding: Operated by Universities Research Association Inc. under Contract No. DE-AC02-76CH03000 with the United States Department of Energy.

The Fermilab Electron Cooling Project requires a straight trajectory and constant beam size to provide effective cooling of the antiprotons in the Recycler. A measurement system was developed using movable appertures and steering bumps to measure the beam size in a 20 m long, nearly continuous, solenoid. This paper discusses the required beam parameters, the implimentation of the measurement system and results for our application.

 
ROPC006 Commissioning of Fermilab's Electron Cooling System for 8-GeV Antiprotons 540
 
  • S. Nagaitsev, D.R. Broemmelsiek, A.V. Burov, K. Carlson, C. Gattuso, M. Hu, B.J. Kramper, T.K. Kroc, J.R. Leibfritz, L.R. Prost, S.M. Pruss, G.W. Saewert, C.W. Schmidt, A.V. Shemyakin, M. Sutherland, V. Tupikov, A. Warner
    Fermilab, Batavia, Illinois
  • W. Gai
    ANL, Argonne, Illinois
  • G.M. Kazakevich
    BINP SB RAS, Novosibirsk
  • S. Seletsky
    Rochester University, Rochester, New York
 
  A 4.3-MeV electron cooling system has been installed at Fermilab in the Recycler antiproton storage ring and is being currently commissioned. The cooling system is designed to assist accumulation of 8.9-GeV/c antiprotons for the Tevatron collider operations. This paper will report on the progress of the electron beam commissioning effort as well as on detailed plans of demonstrating the cooling of antiprotons.