ROPC009 First Acceleration with Superconducting RF Cavities at ISAC-II 662
 
  • R.E. Laxdal, K. Fong, M. Marchetto, W.R. Rawnsley, V. Verzilov
    TRIUMF, Vancouver
 
  We have demonstrated the first acceleration of ions with superconducting rf at TRIUMF/ISAC. Alpha particles from a radioactive source were accelerated from 2.8MeV through the ISAC-II medium beta cryomodule to a maximum energy of 9.4 MeV. The four 106 MHz quarter wave cavities (beta_o=7%) were set to the ISAC-II specified gradient of 6 MV/m (Leff=18cm, Ep=30MV/m and Veff=1.08MV) with a cavity power of about 6W per cavity. The final particle energy spectra was measured with a silicon detector. The initial alpha energy corresponds to a velocity of beta=3.9% giving an expected T/To efficiency of 0.48, 0.76, 0.92 and 0.99 for the four cavities respectively and an expected final energy of 9.6MeV. The experimental set-up including details of the source and diagnostic boxes and the detector electronics are described. Beam simulations of the unbunched, uncollimated beam indicate a unique spectral fingerprint that can be used to unambiguously determine each cavity voltage.  
FPAE027 Status of the ISAC-II Accelerator at TRIUMF 2003
 
  • R.E. Laxdal, W. Andersson, P. Bricault, I. Bylinskii, K. Fong, M. Marchetto, A.K. Mitra, R.L. Poirier, W.R. Rawnsley, P. Schmor, I. Sekachev, G. Stanford, G.M. Stinson, V. Zviagintsev
    TRIUMF, Vancouver
 
  A heavy ion superconducting linac is being installed at TRIUMF to increase the final energy of radioactive beams at ISAC. A first stage of 20MV consisting of five medium beta cryomodules each with four quarter wave bulk niobium cavities and a superconducting solenoid is being installed with initial beam commissioning scheduled for Dec. 2005. The initial cryomodule has met cryogenic and rf performance specifications. In addition we have demonstrated acceleration of alpha particles in an off-line test. A 500W refrigerator system has been installed and commissioned in Jan. 2005 with cold distribution due for commissioning in Sept. 2005. A transfer beamline from the ISAC accelerator and beam transport to a first experimental station are being installed. The status of the project will be presented.