Nadolski, L.S.N.

Paper Title Page
WOAC008 Measuring and Understanding the Momentum Aperture in a Storage Ring 645
 
  • C. Steier, D. Robin
    LBNL, Berkeley, California
  • W. Decking
    DESY, Hamburg
  • J. Laskar
    IMCCE, Paris
  • L.S.N. Nadolski
    SOLEIL, Gif-sur-Yvette
  • Y.K. Wu
    DU/FEL, Durham, North Carolina
 
  Funding: This work was supported by the U.S. Department of Energy, under Contract No. DE-AC03-76SF00098.

The momentum aperture of a storage ring is a very important parameter that strongly influences the performance, especially the beam lifetime. For the special case of synchrotron light sources with small emittance like the Advanced Light Source (ALS), the momentum aperture depends strongly on the transverse dynamics. It is very sensitive to machine conditions such as the tunes, chromaticities, lattice symmetry, and spurious coupling, since depending on those conditions the Touschek scattered particles explore different resonance regions in the phase space. In light sources, the momentum aperture usually also depends strongly on the vertical physical aperture. Applying frequency analysis techniques in simulations and for turn-by-turn orbit measurement data provides a very powerful tool to measure and understand limitations of the dynamic momentum aperture. The techniques presented are applicable to other light sources, as well as damping rings and many types of colliders.

 
RPAE031 Progress Report on the Construction of SOLEIL 2203
 
  • M.-P. Level, J.C. Besson, P. Brunelle, R. Chaput, A. Dael, J.-C. Denard, J.-M. Filhol, J.M. Godefroy, C. Herbeaux, V. Le Roux, P. Marchand, A. Nadji, L.S.N. Nadolski, R. Nagaoka, M.-A. Tordeux
    SOLEIL, Gif-sur-Yvette
 
  Funding: SOLEIL

This paper reports the progress achieved in the construction of the accelerators of SOLEIL. Started in January 2002, the construction comes near to its end and the installation of the equipment on the site has begun from September 2004 and shall be completed within one year. The progress on the LINAC and Booster are reported separately, therefore this paper will focus more particularly on the Storage Ring: Dedicated measuring benches have been built to perform the magnetic measurements on all the magnets and the results of measurements have been analysed in term of particle dynamics behaviour in order to prepare the operating point for the commissioning. The status of innovative developments engaged from the beginning as super-conducting RF cavities, NEG coated vacuum chambers and BPMs digital electronics will be described. The construction of the first 6 insertion devices is also well advanced and will be reported. Finally, the machine impedance budget was further evaluated with consequently, still some modifications to the design of some components.

 
ROPA005 High Level Control Applications for SOLEIL Commissioning and Operation 481
 
  • L.S.N. Nadolski, J. Chinkumo, K. Ho, N.L. Leclercq, M.O. Ounsy, S. Petit
    SOLEIL, Gif-sur-Yvette
 
  Funding: Synchrotron SOLEIL

The SOLEIL control system, namely TANGO developed in collaboration with ESRF, is now mature and stable. TANGO has also been chosen now by several other laboratories. High-level control applications implemented in the control room for the storage ring, the two transfer lines, and the booster will be described in this paper. Three kinds of tools for commissioning are used. First the generic TANGO tools (alarms, simple graphical control applications), which allow us to control in a simple way any TANGO Device Server. Secondly a Matlab Middle Layer (adapted from ALS and SPEAR3): Matlab is fully interconnected with TANGO; it is used primarily for writing Physics control applications. Finally Globalscreen, a commercial SCADA software devoted for building operation applications has been selected (panels for controlling or displaying setpoint, readback values, status of equipments). In addition an overview of the historical and short-term databases for the accelerators will be given. They have been developed in house and tested during the first commissioning.