Morita, A.

Paper Title Page
TPPP002 Global-Beta Measurement and Correction at the KEKB Rings 802
 
  • A. Morita, H. Koiso, Y. Ohnishi, K. Oide
    KEK, Ibaraki
 
  The global-beta correction is a part of the optics corrections which are performed to regularize the ring optics for the luminosity tunings. The global-beta measurement is performed by the reconstruction of the beta function from the set of the single kick orbits generated by the 6 kinds of the steering magnets. The distortion of the beta fucntion and the phase advance are corrected by the global beta correction using the fudge factors of power supplies of quadrupole magnets. These correction scheme are successfully working. In the typical case, the r.m.s. of the beta function beat and the betatron tune difference are corrected within 5% and 0.0005, respectively. In the luminosity run, we can operate the low energy ring(LER) with the horizontal betatron tune very close to half-integer(45.5050). In this paper, we will report in detail the global-beta measurement and correction techniques and its performance in the KEKB operation.  
TPPP003 Lattice Upgrade Plan for Crab Crossing at the KEKB Rings 865
 
  • A. Morita, K. Egawa, K. Hosoyama, H. Koiso, T. Kubo, M. Masuzawa, K. Ohmi, K. Oide, R. Sugahara, M. Yoshida
    KEK, Ibaraki
 
  We plan to install two superconducting crab cavities into the rings at Janyary, 2006. In our plan, we will install one crab cavity per one ring into the NIKKO straight section where the cryogenic infrastructure is already operated for the superconducting accelerating cavities. In order to obtain the correct crabbing angle at the interaction point(IP), we have to enlarge the horizontal beta function(200m for HER) and have to adjust the horizontal phase advance between the IP and the cavity installation point. In this paper, we will report the lattice modified for the crab crossing and the study results about the single beam dynamics.  
TPPP007 Recent Progress at KEKB 1045
 
  • Y. Funakoshi, K. Akai, K. Ebihara, K. Egawa, A. Enomoto, J.W. Flanagan, H. Fukuma, K.  Furukawa, T. Furuya, J. Haba, S. Hiramatsu, T. Ieiri, N. Iida, H. Ikeda, T. Kageyama, S. Kamada, T. Kamitani, S. Kato, M. Kikuchi, E. Kikutani, H. Koiso, M. Masuzawa, T. Mimashi, A. Morita, T.T. Nakamura, H. Nakayama, Y. Ogawa, K. Ohmi, Y. Ohnishi, N. Ohuchi, K. Oide, M. Ono, M. Shimada, S. Stanic, M. Suetake, Y. Suetsugu, T. Sugimura, T. Suwada, M. Tawada, M. Tejima, M. Tobiyama, N. Tokuda, S. Uehara, S. Uno, N. Yamamoto, Y. Yamamoto, Y. Yano, K. Yokoyama, M. Yoshida, M. Yoshida, S.I. Yoshimoto
    KEK, Ibaraki
  • F. Zimmermann
    CERN, Geneva
 
  We summarize the machine operation of KEKB during past one year. Progress for this period, causes of present performance limitations and future prospects are described.