TPAP012 Luminosity Limit from Bound-Free Pair Production in the LHC 1306
 
  • J.M. Jowett, R. Bruce, S.S. Gilardoni
    CERN, Geneva
 
  The luminosity of the LHC as a lead-ion collider is known to be limited by the large cross-sections for electromagnetic processes in ultra-peripheral collisions. In particular, the process of bound-free e-e+ pair production creates secondary beams of Pb81+ ions emerging from the collision points and impinging on the vacuum envelope inside superconducting magnets. New Monte-Carlo simulations, exploiting recent implementations of the physics of ion interactions with matter, are helping us to quantify the relationships among luminosity, energy deposition in the magnet coils and signals on beam loss monitors with a view to predicting and alleviating the quench limit on luminosity.  
RPPE005 Ions for LHC: Beam Physics and Engineering Challenges 946
 
  • S. Maury, M.-E. Angoletta, V. Baggiolini, A. Beuret, A. Blas, J. Borburgh, H.-H. Braun, C. Carli, M. Chanel, T. Fowler, S.S. Gilardoni, M. Gourber-Pace, S. Hancock, C.E. Hill, M. Hourican, J.M. Jowett, K. Kahle, D. Kuchler, E. Mahner, D. Manglunki, M. Martini, M.M. Paoluzzi, J. Pasternak, F. Pedersen, U. Raich, C. Rossi, J.-P. Royer, K. Schindl, R. Scrivens, L. Sermeus, E.N. Shaposhnikova, G. Tranquille, M. Vretenar, Th. Zickler
    CERN, Geneva
 
  The first phase of the heavy ion physics program at the LHC aims to provide lead-lead collisions at energies of 5.5 TeV per colliding nucleon pair and ion-ion luminosity of 1027 cm-2s-1. The transformation of CERN’s ion injector complex (Linac3-LEIR-PS-SPS) presents a number of beam physics and engineering challenges. Conversion of the Low Energy Antiproton Ring (LEAR) to a Low Energy Ion Ring (LEIR) is under way: the high-current electron cooling system, novel broad-band RF cavities and vacuum equipment to achieve 10-12 mbar are the major challenges. Commissioning of LEIR with beam will start in the middle of 2005. Major hardware changes in Linac3 include the installation of the new ECR ion source and of the energy ramping cavity. The PS will have a new injection system and RF gymnastics. A stripping insertion between PS and SPS must not disturb the proton operation. In the LHC itself, there are fundamental performance limitations due to various beam loss mechanisms. To study these without risk of damage there will be an initial period of operation with a reduced number of nominal intensity bunches. While reducing the work required to commission the LHC with ions in 2008, this will still enable early physics discoveries.