Furukawa, K.

Paper Title Page
TPPP007 Recent Progress at KEKB 1045
 
  • Y. Funakoshi, K. Akai, K. Ebihara, K. Egawa, A. Enomoto, J.W. Flanagan, H. Fukuma, K.  Furukawa, T. Furuya, J. Haba, S. Hiramatsu, T. Ieiri, N. Iida, H. Ikeda, T. Kageyama, S. Kamada, T. Kamitani, S. Kato, M. Kikuchi, E. Kikutani, H. Koiso, M. Masuzawa, T. Mimashi, A. Morita, T.T. Nakamura, H. Nakayama, Y. Ogawa, K. Ohmi, Y. Ohnishi, N. Ohuchi, K. Oide, M. Ono, M. Shimada, S. Stanic, M. Suetake, Y. Suetsugu, T. Sugimura, T. Suwada, M. Tawada, M. Tejima, M. Tobiyama, N. Tokuda, S. Uehara, S. Uno, N. Yamamoto, Y. Yamamoto, Y. Yano, K. Yokoyama, M. Yoshida, M. Yoshida, S.I. Yoshimoto
    KEK, Ibaraki
  • F. Zimmermann
    CERN, Geneva
 
  We summarize the machine operation of KEKB during past one year. Progress for this period, causes of present performance limitations and future prospects are described.  
RPAT088 Energy-Spread-Feedback System for the KEKB Injector Linac 4212
 
  • M. Satoh, K.  Furukawa, T. Suwada
    KEK, Ibaraki
 
  New energy-spread feedback system using nondestructive energy-spread monitors have been developed in order to control and stabilize the energy spreads of single-bunch electron and positron beams in the KEKB injector linac. The well-controlled feedback systems of the injector linac are successfully working in dairy operation not only for keeping the injection rate higher along with the beam-orbit and energy feedback systems but also for reducing a background level to the high-energy B-factory experiment. The energy spreads of the injection beams are well stabilized within 0.2%, 0.5% and 0.3% for the electron beam, the positron beam, and the high-current primary electron beam for positron production, respectively, through the energy-spread feedback system under the nominal operation condition. In this paper, we will report in detail the energy-spread feedback system using the nondestructive energy-spread monitors with multi-strip-line electrodes and their performance in the KEKB operation.  
ROPA003 Present Status of the J-PARC Control System 302
 
  • T. Katoh, K.  Furukawa, N. Kamikubota, H. Nakagawa, J.-I. Odagiri, G.S. Shen, Y. Takeuchi, N. Yamamoto, M. Yoshii
    KEK, Ibaraki
  • H. Sakaki, H. Sako, H. Takahashi, F. Tamura, H. Yoshikawa
    JAERI, Ibaraki-ken
 
  Construction of the J-PARC control system is in progress and the present status is reported. The control system is based on EPICS tool-kit used in KEKB and other accelerator control systems at KEK. The control hardware and network system for Linac and RCS(Rapid Cycling Synchrotron) have been installed and software is under development now. The operation of Linac is expected in next year. The test of the first part of the accelerator complex; e.g. ion source, RFQ and the first DTL(20 MeV) were done at KEK site. Development of various software such as device drivers for the new equipment, device support routines, and some application programs for operators were also developed.